FIELD: construction.
SUBSTANCE: pile support of marine hydrotechnical structure, rod structure (1) of which consists of tubular elements and comprises angular and intermediate support stands (2), inside of which the main piles (2) are installed, being joined to appropriate support stands (2) by cement mortar (4), differing by the fact that rod structure (1) is additionally equipped with telescopic piles (5), external cylinder (6) of each telescopic pile (5) is rigidly connected to rod structure (1), internal cylinder (7) by open end interacts with soil, and closed end of internal cylinder (7) and its side surface are rigidly connected to internal surface of external cylinder (6) with the help of cement mortar (4).
EFFECT: improved bearing capacity, reduced labour intensity and cost of marine operations in production of pile works in process of structure fastening to sea bottom.
4 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PILES JACKING IN GROUND | 2008 |
|
RU2370596C1 |
MARINE SHIPPING BERTH | 2008 |
|
RU2373332C1 |
METHOD FOR FIXED MARINE PLATFORM ASSEMBLAGE AND MOUNTING | 2004 |
|
RU2273695C1 |
PILING PIPE SUPPORT FIXING STRUCTURE | 2020 |
|
RU2743549C1 |
SUPPORT SUBSTRUCTURE FOR PERMANENT OFFSHORE PLATFORM | 2004 |
|
RU2259444C1 |
METHOD OF CONSTRUCTING PROCESS PLATFORMS | 2007 |
|
RU2347866C2 |
GRAVITY-PILE PLATFORM AND METHOD OF ITS PLACEMENT ON SEA BED | 2015 |
|
RU2606484C1 |
METHOD FOR CONSTRUCTION OF OFFSHORE DRILLING PLATFORM ON SHALLOW SHELF OF ARCTIC SEAS | 2019 |
|
RU2704451C1 |
METHOD FOR ERECTION OF OFFSHORE STRUCTURE | 2004 |
|
RU2346110C2 |
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
Authors
Dates
2009-10-20—Published
2008-04-04—Filed