METHOD FOR PILES JACKING IN GROUND Russian patent published in 2009 - IPC E02D7/20 

Abstract RU 2370596 C1

FIELD: construction.

SUBSTANCE: invention is related to the field of structures construction with piled foundation, in particular, to construction of marine hydrotechnical structures. Method for piles (2) jacking in ground, in which axial load for jacking is created by an according drive, differs by the fact that piles (2) are captured with the help of stepped drive, bed plate (3) of which is rigidly installed onto rod support structure (1), hydraulic jacks (5) are joined to bed plate (3) with the help of hinged joints (4), to realise stepped feed of working element arranged in the form of lock device (6), which interacts with flexible traction rods (7), having thickening (8) for stepped fixation of traction rods (7) in lock devices (6) in process of working travel of hydraulic jacks (4), at the same time flexible traction rods (7) by their one end are connected to cross beam (9), which transmits axial load to pile (2).

EFFECT: reduction of labour intensity and cost of pile works, by application of crane free technology.

2 dwg

Similar patents RU2370596C1

Title Year Author Number
VIBRATORY PLANT FOR LARGE-DIAMETER SHELL-TYPE PILE PROVIDED WITH CENTRAL ORIFICE DRIVING IN GROUND 2005
  • Jakovlev Ivan Nikolaevich
RU2285088C1
METHOD OF CONSTRUCTING PILE FOUNDATION 0
  • Efremenko Vladimir Mikhajlovich
  • Pushkarevich Valerian Semenovich
  • Romanov Dmitrij Andreevich
  • Udovichenko Vladimir Petrovich
  • Khokhol Viktor Veniaminovich
SU633986A1
PILE SUPPORT OF MARINE HYDROTECHNICAL STRUCTURE 2008
  • Romanchishin Georgij Alekseevich
RU2370594C1
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD 2015
  • Vlasov Aleksandr Nikolaevich
  • Korolev Mikhail Vladimirovich
  • Korolev Petr Mikhajlovich
RU2667163C2
INSTALLATION FOR VIBRATION TAMPING OF PILES IN GROUND 1999
  • Jakovlev I.N.
RU2158803C2
METHOD OF CONSTRUCTION PILE FOUNDATION 0
  • Pushkarevich Valerian Semenovich
  • Melnikov Aleksandr Iosifovich
  • Yablonskij Sergej Mironovich
  • Butenko Vladimir Ivanovich
  • Litvinchuk Grigorij Dmitrievich
  • Chernyj Konstantin Stepanovich
SU789649A1
INSTALLATION FOR DRIVING PILES BY PRESSING-IN 0
  • Efremenko Vladimir Mikhajlovich
  • Palij Aleksandr Pavlovich
  • Rodionov Aleksej Georgievich
SU1359413A1
UNIT FOR DRIVING A PILE INTO SOIL 0
  • Svetinskij Evgenij Vladimirovich
  • Svetinskij Vladimir Nikolaevich
  • Tretyakov Andrej Petrovich
  • Gavrilov Evgenij Borisovich
SU734346A1
METHOD FOR CONSTRUCTION OF PILE FOUNDATION 2015
  • Jurchenko Andrej Anatolevich
RU2581853C1
METHOD OF MANUFACTURING DRILL-DRIVEN PILE 2016
  • Vlasov Aleksandr Nikolaevich
  • Znamenskij Vladimir Valeryanovich
  • Chunyuk Dmitrij Yurevich
  • Mnushkin Mikhail Grigorevich
  • Korolev Petr Mikhajlovich
  • Volkov-Bogorodskij Dmitrij Borisovich
  • Korolev Mikhail Vladimirovich
RU2640059C1

RU 2 370 596 C1

Authors

Romanchishin Georgij Alekseevich

Dates

2009-10-20Published

2008-04-04Filed