FIELD: transport.
SUBSTANCE: in compliance with first and second versions, proposed system comprises automated work stations of depot on-duty personnel, external pickups of railroad vehicle, depot control post, data processing centre, personal electronic key of operator and onboard global navigation system hardware. In compliance with first version, proposed system additionally comprises automated work station for data distribution among railroad vehicle tracking analysis systems. The latter work station has its first, second, third and fourth outputs making outputs of signals sent to aforesaid data processing centre and all afore mentioned work stations. In compliance with the second version, the second and the third outputs of operator personal electronic key make outputs of signal fed to all work stations mentioned above and to data processing centre.
EFFECT: higher safety of railroad traffic.
6 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
AUTOMATED SYSTEM FOR MANAGING OPERATION OF LOCOMOTIVE CREW ON RAILROAD | 2013 |
|
RU2574049C2 |
DIGITAL SYSTEM OF INTELLIGENT INFORMATION ENGINEERING COMMUNICATION IN RAILWAY TRANSPORT | 2021 |
|
RU2771937C1 |
MULTILEVEL CONTROL SYSTEM TO PROVIDE TRAIN TRAFFIC SAFETY IN SHUNTING DEPOTS | 2009 |
|
RU2401217C1 |
UNIFIED COMPUTER COMPLEX FOR INTERVAL CONTROL SYSTEM | 2009 |
|
RU2405702C1 |
AUTOMATED SYSTEM FOR CONTROLLING OPERATION OF COMBINED FLEET OF FREIGHT LOCOMOTIVES AT HANDLING YARD | 2013 |
|
RU2555393C2 |
SYSTEM OF SWITCHING AUTOMATIC CAB SIGNALLING | 2008 |
|
RU2369509C1 |
INTEGRATED SYSTEM FOR MANAGING TRAIN TRAFFIC ON SITE | 2020 |
|
RU2749159C1 |
MULTILEVEL CONTROL SYSTEM TO PROVIDE TRAIN TRAFFIC SAFETY AT MAJOR RAILWAY STATIONS | 2009 |
|
RU2403162C1 |
CONTROL OVER SCHEDULED FREIGHT TRAIN TRAFFIC IN RAILWAY COMMUNICATION | 2013 |
|
RU2541551C1 |
CONTROL DEVICE OF SHUNTING LOCOMOTIVE | 2020 |
|
RU2732266C1 |
Authors
Dates
2009-11-20—Published
2008-05-13—Filed