METHOD FOR DEFINING STRATUM PERMEABILITY ANISOTROPY Russian patent published in 2009 - IPC E21B47/00 

Abstract RU 2374442 C2

FIELD: oil-and-gas production.

SUBSTANCE: invention related to oil-and-gas production, particularly to oil-and-gas development projects data support. Therefore drill vertical or directional well, with a minor angle of fade in PS and perform standard complex of geophysical research in open hole. After that decent and cement a production string, create two types of perforation intervals (PI) with approximate length one tenth of (PS) depth, but not more the one metre, one by the roof of PS, another by the bottom PS. Descent tubing strings and install parker in hole clearance in the mid part of PS, dividing PS from PI for approximately equal parts. After disturb PS during not more than 5 days, by taking out from its bottom part fluid with bottomhole pressure greater then oil saturation pressure or pumping water into upper part of PS throughout hole clearance with pressure not greater than hydraulic fracturing pressure. After that measure pressure change vs. time in bottom part of PS at lower PI level, pressure in upper part of PS, in the hole clearance at upper IP level and oil and water flow rates measurements. Based on results define corrective value of equivalent coefficient permeability anisotropy, used for adaptation of 3D geo-hydrodynamic sector model in well area and its actual research data. Before well casing open hole standard research can be executed, obtaining bottomhole pressure built-up curve, using formation tester fitted on pipes in PS interval and detect its permeability value along the stratums.

EFFECT: reliability improvement and correctness in defining stratum permeability anisotropy of productive stratum (PS) using field research data.

3 cl, 4 dwg

Similar patents RU2374442C2

Title Year Author Number
METHOD OF IMPLEMENTATION OF VERTICAL WATER FLOODING OF OIL DEPOSIT 2007
  • Zakirov Ehrnest Sumbatovich
  • Zakirov Sumbat Nabievich
  • Indrupskij Il'Ja Mikhajlovich
RU2342523C2
METHOD FOR DETERMINING ANISOTROPY OF FORMATION PERMEABILITY IN LABORATORY CONDITIONS 2009
  • Tsagan-Mandzhiev Timur Nikolaevich
  • Indrupskij Il'Ja Mikhajlovich
  • Zakirov Ehrnest Sumbatovich
  • Anikeev Daniil Pavlovich
RU2407889C1
DEVELOPMENT METHOD OF OIL FRINGE IN CARBONATE RESERVOIR OF COMPLEX STRUCTURE 2012
  • Zakirov Sumbat Nabievich
  • Indrupskij Il'Ja Mikhajlovich
  • Zakirov Ehrnest Sumbatovich
  • Zakirov Iskander Sumbatovich
  • Anikeev Daniil Pavlovich
RU2509878C1
METHOD FOR DETERMINING TYPE OF CARBONATE COLLECTOR ON BASIS OF DATA FROM SPECIALIZED WELL RESEARCH 2003
  • Zakirov S.N.
  • Indrupskij I.M.
RU2245442C1
METHOD FOR ARRANGEMENT OF VERTICAL AND LATERAL FLOODING 2012
  • Zakirov Sumbat Nabievich
  • Anikeev Daniil Pavlovich
  • Zakirov Ehrnest Sumbatovich
  • Indrupskij Il'Ja Mikhajlovich
RU2531074C2
SURVEY PERFORMING AND SURVEY RESULT INTERPRETATION METHOD FOR WELL OPENED-UP OIL-AND-GAS BED 2004
  • Zakirov S.N.
  • Zakirov Eh.S.
RU2258137C1
METHOD FOR DEEP-EARTH HYDROCARBON FLUID INFLOW INTENSIFICATION 2004
  • Barenbaum Azarij Aleksandrovich
  • Zakirov Sumbat Nabievich
  • Zakirov Ehrnest Sumbatovich
  • Indrupskij Il'Ja Mikhajlovich
  • Lukmanov Anton Romanovich
RU2278955C1
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSITS 1996
  • Zakirov Sumbat Nabievich
  • Zakirov Iskander Sumbatovich
RU2107810C1
METHOD FOR EDGE OIL RIM DEVELOPMENT 2010
  • Dmitrievskij Anatolij Nikolaevich
  • Zakirov Sumbat Nabievich
  • Zakirov Ehrnest Sumbatovich
  • Indrupskij Il'Ja Mikhajlovich
  • Anikeev Daniil Pavlovich
RU2442882C1
METHOD OF DEVELOPMENT OF OIL POOL AT PRESENCE IN PRODUCTIVE CUT OF SUPERCOLLECTORS 2008
  • Zakirov Sumbat Nabievich
  • Roshchina Irina Viktorovna
  • Indrupskij Il'Ja Mikhajlovich
  • Zakirov Ehrnest Sumbatovich
  • Anikeev Daniil Pavlovich
RU2386020C1

RU 2 374 442 C2

Authors

Zakirov Sumbat Nabievich

Indrupskij Il'Ja Mikhajlovich

Tsagan-Mandzhiev Timur Nikolaevich

Dates

2009-11-27Published

2008-02-08Filed