FIELD: oil-and-gas production.
SUBSTANCE: according to method of bottom hole pumping equipment overhaul period increase in the production well complicated with scaling periodically perform preliminary cleaning out of oil film and asphalt resin paraffin of the mentioned above equipment - pumping of organic solvent into well, then removal of iron saline disposals from the equipment surface - pumping composition with % content: chlorohydric acid or acetic acid 25, corrosion inhibitor 18, scaling inhibitor 17, water 40, in to stopped well tubing annulus, overflush into pump and withstand it 1.5-2.0 hours, that mention above composition used in volume of 5.0-5.5% to well liquid volume from dynamic level to pump intake.
EFFECT: production well pumping equipment overhaul period increase.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REAGENT INJECTION IN WELL | 2004 |
|
RU2302513C2 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF PRODUCER WITH TWO WELLHEADS | 2012 |
|
RU2490443C1 |
METHOD OF OIL WELL OPERATION | 2014 |
|
RU2553689C1 |
METHOD FOR BOTTOMHOLE TREATMENT OF OIL PRODUCING WELLS AND DEVICE TO IMPLEMENT SUCH METHOD | 2006 |
|
RU2331764C2 |
CORROSION PROTECTION METHOD FOR PIPELINES OF WATER-CUT OIL COLLECTING SYSTEM | 2012 |
|
RU2496915C1 |
METHOD FOR REMOVING ASPHALT-RESIN AND PARAFFIN DEPOSITIONS | 1997 |
|
RU2132450C1 |
DEVICE INTENDED FOR GAS WITHDRAWAL FROM ANNULAR SPACE IN OIL WELL | 2014 |
|
RU2567571C1 |
METHOD FOR CHEMICAL PROTECTION OF DOWNHOLE EQUIPMENT AGAINST CORROSION, PARAFFIN AND SALT DEPOSITS AND AGAINST SULFATE-REDUCING BACTERIA | 2004 |
|
RU2260677C1 |
METHOD FOR REMOVING AND PREVENTING SALT DEPOSITION IN A WELL OPERATED BY A SUCKER ROD PUMP | 2021 |
|
RU2762640C1 |
DOWNHOLE PUMP UNIT FOR PRODUCTION OF BITUMINOUS OIL | 2015 |
|
RU2595032C1 |
Authors
Dates
2009-12-10—Published
2008-02-15—Filed