METHOD OF CYCLIC GASLIFT LIQUID PRODUCTION Russian patent published in 2009 - IPC E21B43/16 

Abstract RU 2376461 C2

FIELD: oil-and-gas production.

SUBSTANCE: invention related to oil-and-gas production, particularly oil and gas wells production in condition of low reservoirs pressures. Method includes gas supply into tubing string and gas-liquid mixture lift in the tubing string. Locate tubing string of smaller diametre inside of the tubing string. On a surface install piston pump-compressor with injection and suction valves, right side of its piston cavity connect to tubing sting of smaller diametre, and left side - with tubing string of bigger diametre, install parker at the end of it. When pistons moves to the right, supply gas into tubing string of smaller diametre, and simultaneously create sub atmospheric pressure, which generates required density liquefied mixture, and lift it through out tubing string of bigger diametre. When piston moves to the left transmit pressure on gas-liquid mixture in order to pressurise it. During liquid process create unevenness in gas or gas-liquid mixture supply with piston pump-compressor by transmitting pressure impulses through well liquid column to bottom hole zone.

EFFECT: possibility of creating effect on stratum, power consumption decrease, can be used not only for wells with low production rate, use of simple equipment.

1 dwg

Similar patents RU2376461C2

Title Year Author Number
PROCESS OF BUSTER-LIFT RUNNING OF WELLS 1997
  • Poljakov D.B.
  • Shajmardanov R.F.
  • Aminev M.Kh.
RU2157449C2
METHOD OF GAS-LIFT OPERATION OF WELL 1996
  • Matveev G.N.
  • Khismatulov Ja.T.
  • Menovshchikov V.Ju.
RU2123102C1
METHOD OF OPERATION OF LIQUID-PROPELLANT ROCKET ENGINE WITH TURBOPUMP DELIVERY OF CRYOGENIC PROPELLANT ON BASIS OF FUEL AND OXYGEN OXIDIZER AND LIQUID-PROPELLANT ROCKET ENGINE FOR IMPLEMENTING SAID METHOD 2001
  • Atnabaev Z.M.
  • Bagramov K.A.
  • D'Jachuk I.A.
  • Repin N.N.
  • Repin D.N.
  • Rjazantsev V.M.
  • Shadymukhametov S.A.
  • Shan'Gin E.S.
RU2197609C2
DEVICE FOR WELL FLUID LIFTING AT LATER WELL DEVELOPMENT STAGES 2006
  • Garipov Tel'Man Vagizovich
  • Shagislamov Rishat Nailevich
  • Garipov Il'Dar Tel'Manovich
RU2308593C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD 2007
  • Aminev Marat Khusnullovich
  • Poljakov Dmitrij Borisovich
  • Shajmardanov Ramil' Faritovich
RU2334867C1
WELL GAS-LIFT OPERATION METHOD 2011
  • Nikolaev Nikolaj Mikhajlovich
  • Chubanov Otto Viktorovich
  • Darishchev Viktor Ivanovich
  • Akhmadejshin Il'Dar Anvarovich
RU2471967C1
METHOD OF LIFTING WATER FROM WELLS 2011
  • Grib Vitalij Semenovich
  • Gilaev Gani Gajsinovich
  • Bajzheva Ljudmila Vital'Evna
  • Kuznetsov Jurij Stepanovich
  • Matveev Jurij Gennadievich
RU2465442C1
METHOD FOR OPERATION OF GUSHER WELLS WITH USE OF GAS-LIFT PHENOMENON OF ASSOCIATED OIL GAS 1997
  • Aminev Marat Khusnullovich
  • Poljakov Dmitrij Borisovich
  • Shajmardanov Ramil' Faritovich
RU2129208C1
METHOD FOR PUTTING GAS-LIFT WELL ON STREAM 0
  • Vasilev Vladimir Andreevich
  • Gnedash Elena Eduardovna
  • Berchenko Vladimir Ivanovich
  • Ajrapetyan Sergej Minasovich
  • Golod Garri Savelevich
SU1770550A1
METHOD AND ARRANGEMENT OF HYDRAM FOR BOTTOMHOLE FORMATION AREA AND WELL DEVELOPMENT 2013
  • Erilin Sergej Aleksandrovich
RU2534116C1

RU 2 376 461 C2

Authors

Fajzullin Il'Dar Rinatovich

Dates

2009-12-20Published

2008-02-04Filed