FIELD: oil-and-gas production.
SUBSTANCE: invention related to oil-and-gas production, particularly oil and gas wells production in condition of low reservoirs pressures. Method includes gas supply into tubing string and gas-liquid mixture lift in the tubing string. Locate tubing string of smaller diametre inside of the tubing string. On a surface install piston pump-compressor with injection and suction valves, right side of its piston cavity connect to tubing sting of smaller diametre, and left side - with tubing string of bigger diametre, install parker at the end of it. When pistons moves to the right, supply gas into tubing string of smaller diametre, and simultaneously create sub atmospheric pressure, which generates required density liquefied mixture, and lift it through out tubing string of bigger diametre. When piston moves to the left transmit pressure on gas-liquid mixture in order to pressurise it. During liquid process create unevenness in gas or gas-liquid mixture supply with piston pump-compressor by transmitting pressure impulses through well liquid column to bottom hole zone.
EFFECT: possibility of creating effect on stratum, power consumption decrease, can be used not only for wells with low production rate, use of simple equipment.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF BUSTER-LIFT RUNNING OF WELLS | 1997 |
|
RU2157449C2 |
METHOD OF GAS-LIFT OPERATION OF WELL | 1996 |
|
RU2123102C1 |
METHOD OF OPERATION OF LIQUID-PROPELLANT ROCKET ENGINE WITH TURBOPUMP DELIVERY OF CRYOGENIC PROPELLANT ON BASIS OF FUEL AND OXYGEN OXIDIZER AND LIQUID-PROPELLANT ROCKET ENGINE FOR IMPLEMENTING SAID METHOD | 2001 |
|
RU2197609C2 |
DEVICE FOR WELL FLUID LIFTING AT LATER WELL DEVELOPMENT STAGES | 2006 |
|
RU2308593C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
WELL GAS-LIFT OPERATION METHOD | 2011 |
|
RU2471967C1 |
METHOD OF LIFTING WATER FROM WELLS | 2011 |
|
RU2465442C1 |
METHOD FOR OPERATION OF GUSHER WELLS WITH USE OF GAS-LIFT PHENOMENON OF ASSOCIATED OIL GAS | 1997 |
|
RU2129208C1 |
METHOD FOR PUTTING GAS-LIFT WELL ON STREAM | 0 |
|
SU1770550A1 |
METHOD AND ARRANGEMENT OF HYDRAM FOR BOTTOMHOLE FORMATION AREA AND WELL DEVELOPMENT | 2013 |
|
RU2534116C1 |
Authors
Dates
2009-12-20—Published
2008-02-04—Filed