FIELD: oil-and-gas industry.
SUBSTANCE: well assembly includes main borehole cased in the top part and equipped with a tail-filter in the bottom part and side boreholes, equipped with tail-filters, and a tubing string descended into the well. At that the main borehole has perforation holes, in interval between the bottom side borehole and the main borehole tail-filter, located in a low productivity reservoir. The main and side boreholes tail-filters located in a high productivity reservoir and placed in radial relatively to the main borehole axis. The tubing string equipped with a circulation valve and a top polished tip in the interval over the top side borehole. In the main borehole and side borehole conjunction points - a mini-window units with landing places, fixed in main borehole casing string snap connections. Over the mini-window top unit located a top production parker and a top landing nipple, interacting with the tubing string top section top polished tip. Between the mini-windows top and bottom units located the tubing string intermediate section with a bottom polished tip, hermetically connected to the mini-window bottom unit. Under the mini-window bottom unit located the tubing string bottom section with a bottom production parker, a landing nipple, a under parker tail and a bowl. At the bottom production parker located over the main borehole tail-filter, under the bottom perforation holes. Mini-window units located in a way, that windows located opposite to the side boreholes entrance holes. The top landing nipple bypass hole is greater than the bottom landing nipple bypass hole.
EFFECT: multi zone well construction reliability increase.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTIHOLE LOW DEBIT WELL CONSERVATION IN ABNORMAL LOW PRESSURE RESERVOIR CONDITIONS | 2008 |
|
RU2379467C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST | 2008 |
|
RU2379487C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST AREAS | 2008 |
|
RU2379496C1 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
METHOD OF CONSTRUCTING COASTAL MULTI-HOLE GAS WELL FOR DEVELOPMENT OF SHELF DEPOSIT | 2015 |
|
RU2602257C2 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING | 2009 |
|
RU2403376C1 |
GAS AND GAS CONDENSATE OPEN HOLE WELL DESIGN | 2008 |
|
RU2378497C1 |
Authors
Dates
2010-02-20—Published
2008-07-29—Filed