FIELD: mining engineering.
SUBSTANCE: method includes treatment of peripheral strip in layers benched, leading of operating benches up to design contour under operating angles with reservation of berms between benches and with following filling of berms and slopes by internal dump of rocks. During development of peripheral strip by inclined layers it is implemented formation of inclined berms so that its slope is created alternate, interchanging backfall and lifting, and at the pass boundary of backfall into lifting there are constructed transverse channels and storm collectors.
EFFECT: full or partial excluding of deformations of clay berms and pit walls.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
METHOD OF EXPLOITATION OF SLOPING AND PITCHING THICK DEPOSITS, ELONGATED ALONG THEIR EXTENSION | 0 |
|
SU1745941A1 |
METHOD FOR FINISHING OPENCAST IN MINING STEEPLY DIPPING MINERAL DEPOSITS | 0 |
|
SU1788251A1 |
METHOD FOR OPEN-CUT MINING OF MINERAL DEPOSITS | 2017 |
|
RU2642903C1 |
METHOD FOR OPEN DEVELOPMENT OF STEEPLY-DIPPING DEPOSITS OF ROUND SHAPE WITH INTERNAL DUMPING | 2018 |
|
RU2685590C1 |
METHOD OF COMBINED MINING OF FLOODED MINERAL DEPOSITS | 1999 |
|
RU2165018C2 |
METHOD FOR COMBINED EXTRACTION OF MINERAL RESOURCES IN EDGE-ADJACENT PIT AREA | 2003 |
|
RU2239061C1 |
CONSTRUCTION METHOD OF NON-WORKING OPEN-PIT WALL | 2011 |
|
RU2475648C1 |
PROCESS OF DEVELOPMENT OF DEEP STRIPPING | 2000 |
|
RU2199664C2 |
Authors
Dates
2010-01-20—Published
2008-10-07—Filed