FIELD: oil-and gas industry.
SUBSTANCE: method includes a parker descending and its installation between reservoirs, a surface casing and a production string, pumping equipment with a top and bottom pumps, connected with a rod between each other, and with bars to a drive. At that the top and the bottom pump's inlets connected with over parker and under parker clearance accordingly via a suction valve, and outlets - with the surface casing and the production string. Generate operation movement with the wellhead located drive, transmit it through void bars to pumps and lift top and bottom reservoirs product to the surface through the surface casing and production strings. The pumping equipment equipped with top and bottom screw pumps, descend pumps cases together with the production string, between which bellow the connection with the over parker clearance, on the production string, from top to the bottom installed a sleeve with calibrated longitude channel and a void connector, equipped with additional entrance created on the top surface as an entrance funnel with a liner, located in the connector cavity. Descent into the production string on bars top and bottom crews according to pumps, connected with the rod, which additionally equipped with a blind plunger. Screws and plungers diametres manufactured as reduced from the top to the bottom for passing through not relative to them case and liner during descending process, which finishes after the top and bottom screws interaction with the according pump cases. The plunger hermetically covers the sleeve's longitude channel, separating the bottom pump outlet from the top pump inlet. The wellhead drive generates screws rotation, for lifting the bottom reservoir products to the surface through under parker clearance, the suction valve, the connector cavity using the bottom screw pump and through the surface casing. Lift the top reservoir products through the over parker clearance, production string using the top screw pump.
EFFECT: process capability increase because of reservoirs products, containing hard mechanical particles, long term pumping.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF TWO WELL BEDS WITH DIFFERENTIAL PUMP WITH DRIVE ON TOP | 2008 |
|
RU2368806C1 |
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION | 2008 |
|
RU2381352C1 |
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS | 2009 |
|
RU2405925C1 |
UNIT FOR PUMPING FLUID INTO UPPER RESERVOIR OF WELL FROM LOWER ONE | 2010 |
|
RU2436939C1 |
WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE DEVELOPMENT OF TWO RESERVOIRS | 2008 |
|
RU2413875C2 |
OIL WELL PUMPING UNIT FOR DUAL RESERVOIR PUMPING | 2006 |
|
RU2318992C1 |
PUMP PLANT FOR SIMULTANEOUS OR SEPARATE PUMPING OF DISPLACEMENT AGENT TO TWO INTERVALS OF WELL | 2009 |
|
RU2393342C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR | 2024 |
|
RU2825381C1 |
METHOD OF TWO RESERVOIRS SUMULTANIOUS-SEPARATE PRODUCTION | 2008 |
|
RU2380525C1 |
Authors
Dates
2010-01-27—Published
2008-07-23—Filed