METHOD OF TWO RESERVOIRS SUMULTANIOUS-SEPARATE PRODUCTION Russian patent published in 2010 - IPC E21B43/14 

Abstract RU 2380525 C1

FIELD: oil-and gas industry.

SUBSTANCE: method includes descending a tubing string with a parker, equipped with an anchor, till the required installation interval, the anchor fixing with the parker installation between reservoirs, descending a pump and reservoir product extraction, simultaneous or separate. According to the method descend the parker with the anchor and additional rotation drive on a cable, which length is efficient enough the parker installation between reservoirs with the pump, located lower then a both reservoirs fluid level. After that fix the cable on the tubing string, equipped with the submersible pump with an additional cable of capacity efficient enough to extract both reservoir products. Descend the tubing string with cables into the borehole until parker dislocation between reservoirs. Install the parker with anchor between reservoirs supplying voltage via motor. Start up the pump supplying voltage with additional cable. Define upper reservoir capacity. Then supplying reverse voltage via cable to the drive, return the parker with anchor into bypass position. Then start up the pump supplying voltage with additional cable. In result define hydrodynamic properties of the lower level according to the first research. According to the research results select parkers with anchor mounting-dismounting period at the pump constantly working for the optimal production from the upper reservoir at the parker mounted till the fluid level decreases lower then the dynamic level of the less productive reservoir and higher then the top pump or from the both reservoirs at parker dismounted till dynamic fluid level is less then productive reservoirs one.

EFFECT: method efficiency increase.

3 cl, 1 dwg

Similar patents RU2380525C1

Title Year Author Number
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION 2008
  • Parijchuk Nikolaj Ivanovich
RU2381352C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF TWO WELL BEDS WITH DIFFERENTIAL PUMP WITH DRIVE ON TOP 2008
  • Parijchuk Nikolaj Ivanovich
RU2368806C1
METHOD OF ONE WELL TWO RESERVOIRS SIMULTANEOUSE PRODUCTION USING PUMPING EQUIPMENT WITH DRIVE LOCATED ON WELLHEAD 2008
  • Parijchuk Nikolaj Ivanovich
RU2380524C1
OIL WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO RESERVOIRS 2009
  • Parijchuk Nikolaj Ivanovich
  • Nagumanov Marat Mirsatovich
  • Aminev Marat Khusnullovich
RU2405925C1
UNIT FOR PUMPING FLUID INTO UPPER RESERVOIR OF WELL FROM LOWER ONE 2010
  • Parijchuk Nikolaj Ivanovich
RU2436939C1
DRIVE OF ELECTRIC SUBMERSIBLE PUMP WITH OUTER JACKET 2010
  • Parijchuk Nikolaj Ivanovich
RU2433307C1
MULTI-RESERVOIR OIL FIELD DEVELOPMENT METHOD 2008
  • Parijchuk Nikolaj Ivanovich
RU2380523C1
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION 2014
  • Nagumanov Marat Mirsatovich
  • Kamil'Janov Timerbaj Sabir'Janovich
  • Shamilov Faat Takhirovich
  • Tokmakov Nikolaj Fedorovich
  • Glavatskikh Jurij Sergeevich
  • Fedorov Roman Aleksandrovich
  • Rjazanov Aleksandr Vladimirovich
  • Kuznetsov Aleksej Vladimirovich
RU2546218C1
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION 2012
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
  • Shamilov Faat Takhirovich
RU2515630C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2562641C2

RU 2 380 525 C1

Authors

Parijchuk Nikolaj Ivanovich

Dates

2010-01-27Published

2008-07-29Filed