FIELD: road construction.
SUBSTANCE: watertight band with cords-weights fastened (sewn) thereto is used to accelerate uniform ice buildup all over ice ferry area. For this aforesaid band with cord-float and cords-weights fastened thereto is downed via prepared through ice-hole oriented along said ferry across under-ice water current. Heavier weight is arranged at the distance, exceeding ice thickness, from the edge of band fixed on ice sheet surface.
EFFECT: higher reliability of ferry.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BUILDING ICE CROSSING | 2013 |
|
RU2554376C2 |
METHOD FOR CREATION OF ICE-BOUND CROSSING | 1998 |
|
RU2132900C1 |
METHOD FOR CREATION OF ICE-BOUND CROSSING | 1998 |
|
RU2132899C1 |
METHOD FOR CREATION OF ICE CROSSING | 2016 |
|
RU2646291C2 |
ICE CROSSING CONSTRUCTION PROCESS | 2000 |
|
RU2164975C1 |
METHOD FOR ERECTING TEMPORARY ICE BRIDGE | 2000 |
|
RU2171332C1 |
METHOD OF BUILDING ICE BRIDGE | 2008 |
|
RU2379409C1 |
METHOD FOR ERECTING TEMPORARY ICE BRIDGE | 2000 |
|
RU2171333C1 |
ICE ROAD CROSSING | 2018 |
|
RU2686872C1 |
METHOD TO CREATE REINFORCED ICE BRIDGE FOR WIDE PONDS | 2013 |
|
RU2569694C2 |
Authors
Dates
2010-02-20—Published
2008-10-27—Filed