FIELD: construction.
SUBSTANCE: ice is reinforced with the help of a tightened steel net, which is frozen into the lower ice edge. Steel net during assembly is kept at depth along entire bridge until its complete freezing with grips in each hole. Sagging is developed between bearing steel ropes, and auxiliary ropes are frozen in layers at the bottom. Ice monolith is created along entire thickness.
EFFECT: invention provides for bridge commissioning for wide ponds at earlier time, increased weight-lifting capacity and bridge service life in spring.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ACCELERATED CREATION AND RESTORATION OF ICE CROSSING | 2017 |
|
RU2642735C1 |
METHOD OF CREATING ICE CROSSING | 2023 |
|
RU2819050C1 |
METHOD TO WEAKEN MONOLITH OF RIVER ICE COVER AND DEVICE FOR ITS REALISATION | 2010 |
|
RU2452813C2 |
METHOD OF BUILDING ICE BRIDGE | 2008 |
|
RU2379409C1 |
ICE ROAD CROSSING | 2018 |
|
RU2686872C1 |
METHOD FOR CONSTRUCTION OF REINFORCED ICE CROSSINGS | 2021 |
|
RU2790293C1 |
METHOD FOR ERECTING TEMPORARY ICE BRIDGE | 2000 |
|
RU2171332C1 |
COMPOSITE ELEMENT FOR REINFORCEMENT OF ICE STRUCTURES | 2023 |
|
RU2810345C1 |
METHOD FOR CREATING ICE-BOUND CROSSING | 1998 |
|
RU2132898C1 |
METHOD OF CREATING ICE CROSSING | 2023 |
|
RU2819071C1 |
Authors
Dates
2015-11-27—Published
2013-11-05—Filed