FIELD: oil and gas industry.
SUBSTANCE: method for recovery of filtration and capacity properties of an oil-bearing collector having deteriorated during the well construction completion involving performance of geophysical survey, flushing the borehole, pumping a water solution of surfactants and a solvent into the interval of the productive stratum along the string of pump and compressor pipes, secondary opening of the productive stratum with drilling fluid within the interval specified; the said solution is represented by a water solution of a complex surfactant with solvent Oy-plast 04 with 2-3 % concentration whereto foam extinguisher PENTA-463, the volume ratio of Oy-plast 04 : and the said foam extinguisher being 45:1 - 90:1; after the above solution pumping it is flushed with drilling liquid till a hydrostatically stable condition and the well is left to soak during 12-15 hours.
EFFECT: achievement of improved results in recovery of filtration and capacity properties combined with reduction of material and capital expenditures.
| Title | Year | Author | Number |
|---|---|---|---|
| RECOVERY METHOD FOR NATURAL RESERVOIR PERFORMANCE DETERIORATED DURING WELL CONSTRUCTION | 2012 |
|
RU2534171C2 |
| METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
| PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
| METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
| JETTING ROPE SCRAPER | 2014 |
|
RU2571475C1 |
| METHOD FOR WELL CASING WITH RESERVOIR PROPERTIES RETENTION IN PRODUCTIVE BED | 2003 |
|
RU2268351C2 |
| METHOD FOR WATER INFLOW ISOLATION IN NON-CASED HORIZONTAL PART OF PRODUCTION WELL BORE | 2004 |
|
RU2273722C2 |
| WELL COMPLETION METHOD | 2004 |
|
RU2280752C2 |
| METHOD OF SECURING WELLS | 0 |
|
SU883334A1 |
| HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS | 2010 |
|
RU2428560C1 |
Authors
Dates
2010-06-20—Published
2009-04-15—Filed