FIELD: oil and gas production.
SUBSTANCE: in method for liquidation of absorption zones in well, including simultaneous pumping of two flows - liquid carrier with phosphogypsum and with liquid sodium glass, liquid carrier is represented by clayey drilling solution, containing carboxymethylcellulose or carboxymethylated starch, and specified pumping is carried out in parallel with mixing of flows prior to injection into isolated interval of reservoir.
EFFECT: improved efficiency of repair-isolation works under conditions of intense absorption as a result of elimination of complications when doing repair-isolation works by development of sedimentation-stable flows and reduction of structuring time in zone of disturbance.
2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DOING REPAIR-ISOLATION WORKS UNDER CONDITIONS OF INTENSE ABSORPTION | 2009 |
|
RU2405926C1 |
INSULATION METHOD OF WATER INFLUX AND WELL THIEF ZONE | 2008 |
|
RU2378490C1 |
METHOD TO INSULATE ABSORPTION ZONE IN WELL | 2010 |
|
RU2447258C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
METHOD FOR DISASTROUS DRILLING MUD LOSS ZONES ISOLATION DURING OIL AND GAS HOLE DRILLING | 2004 |
|
RU2270327C1 |
METHOD OF REPAIR AND INSULATION OPERATIONS IN A WELL | 2016 |
|
RU2618539C1 |
COMPOUND FOR ISOLATION OF WATER INFLOW AND ABSORBING ZONES IN WELL, AND ITS APPLICATION METHOD | 2011 |
|
RU2483093C1 |
METHOD OF WELL ABSORPTION ZONE ISOLATION | 2012 |
|
RU2504641C1 |
METHOD OF REPAIR-INSULATION WORKS IN WELL (VERSIONS) | 2015 |
|
RU2599154C1 |
METHOD FOR ISOLATION OF LOST CIRCULATION ZONE OF DRILLING MUD DURING OIL AND GAS WELLS | 2023 |
|
RU2825228C1 |
Authors
Dates
2010-12-10—Published
2010-01-11—Filed