FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to oil-and-gas industry and can be used in developing sticky oil and bitumen reservoirs. Substance claim: fill-in wells and horizontal extracting wells are drilled, heat carrier is injected via fill-in wells and oil is extracted through production wells. Bore of production horizontal well is located nearby production formation bottom so that the distance from the point fill-in well bore enters the production formation at horizontal section of production well bore makes 0.8 of formation depth. Bottom section of fill-in well bore is arranged at one level horizontal production well at 5 to 10 m between them. Note here that fill-in wells are drilled controlled-directional at 45° to formation bottom.
EFFECT: efficient displacement of sticky oil and bitumen, increased oil yield, higher rate of formation heating and extraction rate.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2496000C1 |
METHOD OF HIGH-VISCOSITY OIL OR BITUMEN POOL DEVELOPMENT | 2010 |
|
RU2433256C1 |
METHOD TO DEVELOP STICKY OIL AND BITUMEN ACCUMULATION | 2009 |
|
RU2387819C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSIT | 2011 |
|
RU2483206C1 |
METHOD FOR EXTRACTING LAYER-ZONE-WISE HETEROGENEOUS FORMATION OF HIGHLY VISCOUS OIL OR BITUMEN | 2006 |
|
RU2295030C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2010 |
|
RU2434127C1 |
METHOD FOR DEVELOPING HIGH-VISCOSITY OIL | 2017 |
|
RU2663532C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494240C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSITS OR BITUMENS AT THERMAL EFFECT | 2012 |
|
RU2527051C1 |
Authors
Dates
2010-04-27—Published
2009-02-03—Filed