FIELD: oil and gas industry.
SUBSTANCE: method involves drilling of injection and production horizontal wells with location of a working face of an injection well above the middle part of horizontal production well, pumping of heat carrier through injection wells, extraction of product through production horizontal wells with monitoring of the product temperature. When allowable temperature is exceeded, a packer is installed and then transferred in a production well for extraction in a section of horizontal shaft with lower temperature. An injection well is drilled above a production well in its direction. Injection well is equipped with additional portable blind packer, which is transferred in horizontal section from well head to working face parallel to packer of production well, which is installed after break of heat carrier from injection well to production well with creation of hydrodynamic communication between those wells for cutout of heat carrier break section. At further break of heat carrier from injection well to production well above the installed packer, it is reinstalled in series above heat carrier break sections.
EFFECT: increasing oil recovery of a formation, increasing the coverage range of the formation with an agent influencing due to enlarging the formation warm-up zone.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494240C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2010 |
|
RU2434127C1 |
METHOD OF DEVELOPMENT OF HIGH-VISCOSITY AND HEAVY OIL DEPOSIT WITH THERMAL IMPACT | 2018 |
|
RU2686766C1 |
HIGH-VISCOSITY OIL OR BITUMEN RECOVERY METHOD, USING HYDRAULIC FRACTURES | 2016 |
|
RU2626845C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL AND BITUMEN DEPOSITS | 2010 |
|
RU2435950C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL AND BITUMEN DEPOSITS | 2010 |
|
RU2435947C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT USING FLOODING | 2012 |
|
RU2504646C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL OR BITUMEN DEPOSITS AT THERMAL EFFECT | 2012 |
|
RU2513744C2 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT WITH CARBONATE COLLECTOR | 2012 |
|
RU2520123C1 |
Authors
Dates
2013-10-20—Published
2012-04-12—Filed