FIELD: oil and gas industry.
SUBSTANCE: development method of deposits of high-viscosity oil or bitumens involves drilling of injection and production horizontal wells with location of a working face of an injection well above middle part of horizontal production well, pumping of heat carrier through injection wells, extraction of product through production horizontal wells with monitoring of the product temperature; when allowable temperature is exceeded, a packer is installed and its further transfer in a production well for extraction in a section of horizontal shaft with lower temperature. An injection well is drilled above a production well in its direction. Horizontal section of production well is drilled with packing of perforation holes from the head to the working face, and section of injection well is drilled from the working face to the head. A packer is installed after break of heat carrier from injection well to production well with creation of hydrodynamic communication between those wells for cutout of heat carrier break section. At further break of heat carrier from injection well to production well above the installed packer, it is reinstalled in series above heat carrier break sections.
EFFECT: increasing oil recovery of a formation, increasing the coverage range of the formation with an agent influencing due to enlarging the formation warm-up zone.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN | 2012 |
|
RU2496000C1 |
DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMENS | 2012 |
|
RU2494241C1 |
METHOD OF DEVELOPMENT OF HIGH-VISCOSITY AND HEAVY OIL DEPOSIT WITH THERMAL IMPACT | 2018 |
|
RU2686766C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL OR BITUMEN DEPOSIT | 2010 |
|
RU2434127C1 |
HIGH-VISCOSITY OIL OR BITUMEN RECOVERY METHOD, USING HYDRAULIC FRACTURES | 2016 |
|
RU2626845C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT USING FLOODING | 2012 |
|
RU2504646C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL AND BITUMEN DEPOSITS | 2010 |
|
RU2435950C1 |
PROCEDURE FOR DEVELOPMENT OF HEAVY OIL AND BITUMEN DEPOSITS | 2010 |
|
RU2435947C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT AT LATE STAGE | 2012 |
|
RU2506418C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL OR BITUMEN DEPOSITS AT THERMAL EFFECT | 2012 |
|
RU2513744C2 |
Authors
Dates
2013-09-27—Published
2012-04-12—Filed