FIELD: oil and gas industry.
SUBSTANCE: invention relates to oil producing industry, in particular - to methods for opening productive oil and gas strata by way of perforation with the help of explosives. The stratum opening method involves pumping a breakdown agent into the well as represented by a viscoelastic liquid whose time of relaxation after a deformation impact is equal to at least the period of hydropercussive wave action, perforator release, stratum perforation and well sealing. First one prepares the viscoelastic liquid mixing it with hollow glass microspheres whose mechanic strength exceeds bottom-hole pressure inside the well by 0.5-1 MPa in an amount of 10-30% of its volume and increasing its weight for the density to exceed the well fluid density by a factor of 1.1-1.2 which is then pumped into the well followed by release of the perforate on the pump and compressor pipes pre-equipped with a destroyable membrane and a fuse. Then one decreases the bottom-hole pressure inside the well to provide for generation of an influx from the stratum filling the pump and compressor pipes with lightweight fluid with the well sealing performed in the space behind the pipes with the help of a packer system.
EFFECT: improved efficiency of explosion works in deep wells combined with provision for protection against destruction of equipment inside the well positioned in proximity to the explosion zone.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PERFORMING EXPLOSION IN WELL DURING ITS PERFORATION OR PROCESSING OF WELL-ADJACENT ZONE | 2003 |
|
RU2255207C1 |
PROCESS OF WELL COMPLETION | 2002 |
|
RU2220280C1 |
METHOD AND DEVICE FOR CUMULATIVE OIL WELL PERFORATION (VARIANTS) | 2004 |
|
RU2275496C2 |
METHOD OF KILLING SHOCK WAVE IN UNDERWATER EXPLOSION | 2009 |
|
RU2392579C1 |
SIMULATED COMPLETION METHOD FOR GAS WELL PRODUCTIVE FORMATIONS | 2013 |
|
RU2517250C1 |
METHOD FOR OPENING PRODUCTIVE STRATUM | 1988 |
|
SU1570384A1 |
METHOD FOR INITIATION OF PERFORATORS RUN IN WITH TUBE STRING | 2012 |
|
RU2500881C1 |
METHOD OF WELL SURVEYING ON DEPRESSION PRIOR TO BEGINNING OF PRODUCTION, AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2399759C1 |
METHOD FOR SECONDARY TWO-PHASE SATURATED FORMATION PENETRATION | 2003 |
|
RU2262592C2 |
WAY TO EXECUTE CHAMBERING-BLASTING OPERATIONS IN WELLS ( VARIANTS ) | 2000 |
|
RU2202036C2 |
Authors
Dates
2010-06-20—Published
2009-03-31—Filed