FIELD: oil and gas industry.
SUBSTANCE: prior to the beginning of production there fixed are cumulative perforators (CP) in groups in number equal to the number of PF in the well on cable or on tubing string (TS). Geophysical instruments (GI) are fixed above CP at safe distance. Distances between CP and distances between GI are equal to the distances between productive formations (PF). The device is lowered to the well at the specified depth so that CP can be located in perforation intervals of each PF. Prior to the secondary drilling of PF with perforation the well is filled with liquid to the level providing design maximum depression value for the formation. Secondary drilling of PF is performed with perforation. Immediately after secondary drilling of PF there moved is geophysical cable or tubing string with CP and GI installed on them till the latter are located in perforation intervals of every PF. Investigations of process parametres of operation of each GI PF are performed. After dynamic level is recovered with fluid from formations or after the well is filled with fluid, geophysical cable or tubing string is removed to the surface. GI readings are taken for the purpose of recommendations on production process optimisation.
EFFECT: improving accuracy of results of investigations, reducing the time required for investigations.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SECONDARY BED DRILLING-IN AT DEPRESSION WITH LOWERING OF PERFORATOR FOR SUBSURFACE PUMP AND DEVICE TO THIS END (VERSIONS) | 2014 |
|
RU2571790C1 |
SIMULATED COMPLETION METHOD FOR GAS WELL PRODUCTIVE FORMATIONS | 2013 |
|
RU2517250C1 |
METHOD OF PERFORATION OF PRODUCING FORMATIONS IN OIL AND GAS WELLS UNDER DRAWDOWN | 1999 |
|
RU2171367C2 |
METHOD OF OPERATION OF WELL JET PUMPING UNIT IN FORMATION PERFORATION | 2002 |
|
RU2213277C1 |
METHOD OF AND PLANT FOR OPERATING JET UNIT AT HYDRAULIC FRACTURING OF FORMATION | 2004 |
|
RU2263236C1 |
GEAR AND TECHNOLOGY OF REPEAT OPENING OF PRODUCTIVE POOLS | 2000 |
|
RU2183259C2 |
METHOD FOR CREATING CASED PERFORATION CHANNEL IN PRODUCTIVE FORMATION OF OIL OR GAS CASED WELL | 2020 |
|
RU2746398C1 |
METHOD OF OPERATION OF WELL PUMPING UNIT AT WELL COMPLETION AND WELL PUMPING UNIT FOR METHOD EMBODIMENT | 2001 |
|
RU2189504C1 |
CUMULATIVE PUNCH | 0 |
|
SU1771508A3 |
METHOD AND DEVICE FOR CUMULATIVE OIL WELL PERFORATION (VARIANTS) | 2004 |
|
RU2275496C2 |
Authors
Dates
2010-09-20—Published
2009-05-05—Filed