FIELD: mining.
SUBSTANCE: method involves installation of individual posts and attachment of an air track with the reinforced support. Development of the bed is performed with sub-levels along the strike after the mining face. Individual posts in the mining face are installed between the sections consisting of protective elements. During movement the protective elements are supported on supports and bearings installed on individual posts. As disassembly chamber for the face support there used is a flank coal chute.
EFFECT: increasing working conditions of miners, increasing labour productivity, reducing labour intensity of mining work and production cost of coal.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SUBLEVEL WORKING OF STEEP SEAMS WITH SANDSTOWING | 2011 |
|
RU2467169C1 |
METHOD OF HYDROMECHANICAL MINING OF STEEP COAL SEAMS | 0 |
|
SU1298381A1 |
METHOD FOR MEDIUM-THICKNESS STEEP MINERAL SEAM DEVELOPMENT ALONG WITH GOAF FILLING | 2005 |
|
RU2285799C1 |
THICK PITCHING COAL SEAM EXPLOITATION METHOD | 0 |
|
SU1745938A1 |
METHOD FOR DEVELOPMENT OF STEEP COAL SEAMS OF MEDIUM THICKNESS | 1994 |
|
RU2085738C1 |
METHOD FOR EXTRACTION OF THIN AND AVERAGELY THICK STEEP FORMATIONS OF MINERAL RESOURCE WITH BACKFILL OF EXTRACTED SPACE | 2005 |
|
RU2293182C1 |
SUPPORT OF MINING FACE OF NEAR-VERTICAL COAL SEAM | 2007 |
|
RU2348812C1 |
METHOD FOR THICK STEEP MINERAL SEAM MINING ALONG WITH GOAF FILLING | 2005 |
|
RU2283431C1 |
METHOD OF UNDER-LEVEL PLASTS' DEVELOPMENT PROCESSING WITH THE BINDING OF THE ESTABLISHED SPACE | 2017 |
|
RU2644185C1 |
CONTROLLABLE SHIELD ROOF FOR MINING OF STEEP SEAMS WITH MINED-OUT SPACE FILLING | 2007 |
|
RU2332570C1 |
Authors
Dates
2010-06-27—Published
2009-05-04—Filed