FIELD: mining.
SUBSTANCE: system includes pit shaft with air-sound channels, ventilation and noise silencer chambers and ventilation stall. Stall is attached to pit shaft by means of the pipeline piece built in the building located above the underground structure. Between ventilation and noise silencer chambers there installed is elastic diaphragm with an opening.
EFFECT: reducing noise level by means of multi-staged silencing.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
VENTILATION BOOTH OF THE METRO | 2007 |
|
RU2319079C1 |
VENTILATION BOX OF THE SUBWAY | 2008 |
|
RU2368848C1 |
SILENCER OF UNDERGROUND FACILITY | 2010 |
|
RU2444631C1 |
METRO VENTING CABIN | 2006 |
|
RU2286459C1 |
NOISE-ABSORPTION DEVICE | 1997 |
|
RU2137214C1 |
METHOD FOR PREVENTING INLEAKS OF AIR THROUGH MOUTH OF AIR-WITHDRAWAL VENTILATION SHAFT | 1997 |
|
RU2127811C1 |
METHOD OF VENTILATION OF UNDERGROUND MINE WORKINGS | 2022 |
|
RU2794842C1 |
DEVICE FOR DECREASING AIR PERMEABILITY OF HEAD HOUSE | 0 |
|
SU1712626A1 |
METHOD OF REVERSIBLE TUNNEL VENTILATION OF UNDERGROUND RAILWAYS WITH PARTIAL RAIL REGULATION | 0 |
|
SU1090884A1 |
METHOD FOR VENTILATION OF DEEP METRO TUNNELS DURING THEIR CONSTRUCTION | 1996 |
|
RU2105098C1 |
Authors
Dates
2010-06-27—Published
2009-05-27—Filed