FIELD: underground construction technology. SUBSTANCE: according to method, after joining of tunnel sections, their ventilation is effected by through streams on principle of operational ventilation by means of main ventilation plant with regulation of flow rate in directions with help of partitions with openings, and partitions with windows. Blind workings can be ventilated due to overall mine depression and these workings can be as long as 10 m. Partitions with openings can be installed in all streams, except stream of maximal depression, partitions with windows can be installed in inclined entries and underwater tunnels of ventilation shafts. EFFECT: high efficiency. 4 cl
Title | Year | Author | Number |
---|---|---|---|
PREPARATION METHOD OF BED DEPOSITS FOR ADVANCE MINING AT ROOM-AND-PILLAR SYSTEM | 2010 |
|
RU2435961C1 |
METHOD FOR OPENING AND PREPARATION OF MINE FIELD FOR FLAT-LAYING COAL SEAM | 2005 |
|
RU2278262C1 |
DOUBLE-ENDED METHOD OF DEPOSIT OPENING DURING UNDERGROUND OPERATIONS | 2012 |
|
RU2520316C1 |
METHOD OF VENTILATING BLIND MINE WORKING | 1999 |
|
RU2162946C2 |
METHOD FOR DEVELOPMENT OF A FLAT COAL BED | 2019 |
|
RU2722910C1 |
METHOD OF PREPARATION AND MINING CONTIGUOUS FLAT SEAMS | 2013 |
|
RU2530102C1 |
VENTING OF EXTRACTION BLOCK AT INVERSE WORKING OF ON-DIP MINERAL | 2014 |
|
RU2569647C1 |
METHOD FOR DUST AND GAS REMOVAL FROM STOPE ORE | 2010 |
|
RU2453702C1 |
METHOD FOR VENTILATION OF BLIND WORKINGS | 1994 |
|
RU2085747C1 |
METHOD FOR VENTILATION OF UNDERGROUND MINING OPERATIONS IN COMBINED DEVELOPMENT OF SYNCLINAL COAL DEPOSITS | 2017 |
|
RU2679003C1 |
Authors
Dates
1998-02-20—Published
1996-04-25—Filed