FIELD: construction.
SUBSTANCE: invention relates to construction and may be used to arrange drainage system to control water level in basement premises. Method for water depression in basement premises of dwelling houses, administrative-industrial buildings and storehouses includes digging drainage channels, assembly of precast filtering well, laying filtering material or perforated pipes with filtering elements into channels, installation of pump into well, which drains water from well and is equipped with connection and disconnection breaker. Drainage channels and precast filtering well are assembled in ground inside area fenced by house foundation, in order to create depression zone on area limited by house foundation. In case this area is separated by solid walls of foundation, or there are foundation screeds, shafts are drilled, which are also filled with filtering material, or in which perforated pipes are installed with filtering elements. Outlet hole of pump is connected to sewage system of the house. Connection of pump outlet to connection and disconnection breaker to sewage system of the building results in cleaning of pipes and joints in sewage system.
EFFECT: improved efficiency of water level control in basement premises and reinforcement of foundations with various configuration.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WATER DRAWDOWN OF VERTICAL TYPE IN BASEMENT PREMISES OF RESIDENTIAL HOUSES, OFFICE AND INDUSTRIAL BUILDINGS AND STORAGES | 2011 |
|
RU2464382C1 |
METHOD FOR ORGANIZATION OF DRAINAGE VENTILATION IN BASEMENTS OF RESIDENTIAL BUILDINGS, ADMINISTRATIVE AND INDUSTRIAL BUILDINGS, AND STORAGE FACILITIES WITH HIGH HUMIDITY | 2022 |
|
RU2785299C1 |
RESIDENTIAL BUILDING BASEMENT DRAINAGE METHOD | 2015 |
|
RU2614004C2 |
PROCESS OF CONSTRUCTION OF DRAINAGE SYSTEM | 2000 |
|
RU2195530C2 |
METHOD FOR DRAINING LANDS WITH CLOSE GROUNDWATER BEDDING WHILE BUILDING AERODROME RUNWAYS | 2016 |
|
RU2618693C1 |
DRAINAGE SYSTEM | 1999 |
|
RU2159306C1 |
METHOD FOR CONSTRUCTION OF DRAINAGE WAREHOUSE HOUSINGS WITH CENTRAL HORIZONTAL BURIED DRAIN | 2015 |
|
RU2588547C1 |
RICE DRYING-HUMIDIFYING SYSTEM | 2023 |
|
RU2813775C1 |
METHOD FOR ERECTION OF VERTICAL DRAIN | 2009 |
|
RU2415998C1 |
RICE IRRIGATION SYSTEM | 2023 |
|
RU2814818C1 |
Authors
Dates
2010-07-27—Published
2009-04-08—Filed