FIELD: oil and gas industry.
SUBSTANCE: invention refers to oil industry and can be used for selective formation isolation in well completion. A selective well completion device comprises at least one adjusting sleeve valve with its body mounted on a pipe, at least one temperature-sensitive element, and a surface control and monitor unit connected with the valve and element through a drive line. The valve is opposite to a producing formation and connected therewith through collars in a well casing. A valve actuator is permanently connected with its sleeve and provided with at least two working parts made of a shape memory alloy, each of which is permanently or intermittently located in a coverage of an electric heating element, and each working part is connected with its one end to a support, and with another - to the sleeve of the sleeve valve; at least one working part of each sleeve valve is mounted above, and another - under the attached sleeve. Additionally, the device can contain a lifting gear and a shuttle whereon at least one heating element and a related thermocouple are provided.
EFFECT: enhanced device.
8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR SELECTIVE COMPLETION OF WELL | 2010 |
|
RU2435932C1 |
SELECTIVE WELL COMPLETION DEVICE | 2009 |
|
RU2393330C1 |
SELECTIVE WELL COMPLETION DEVICE | 2009 |
|
RU2393327C1 |
VALVE WITH THERMOSENSITIVE CONTROL | 2011 |
|
RU2484235C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SEQUENTIAL PRODUCTION OF FORMATION FLUID IN WELLS OF MULTILAYER FIELDS WITH USE OF DOWNHOLE DISCONNECTABLE WET CONTACT UNIT | 2011 |
|
RU2500882C9 |
DOWNHOLE SYSTEM WITH STRING HAVING ELECTRIC PUMP AND INDUCTIVE COUPLER | 2007 |
|
RU2455460C2 |
WELL SYSTEM REMOVED FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL PRODUCTIVE FORMATIONS | 2008 |
|
RU2389868C1 |
AGGREGATE FOR DUAL BED OPERATION IN WELL | 2014 |
|
RU2550633C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
BOREHOLE FLUID PUMPING SYSTEM (VARIANTS) AND PROCESS OF BOREHOLE FLUID PUMPING | 2006 |
|
RU2328588C2 |
Authors
Dates
2010-08-10—Published
2009-05-13—Filed