FIELD: oil and gas production.
SUBSTANCE: system for use in the hole includes the string designed for location in the hole that consists of submersible electric pump, the first part of inductive coupler and completion section. Note that completion section is located in the well zone under development and includes the second part of inductive coupler, isolating packer, detection cable and electric device electrically connected to the second part of inductive coupler. Note that detection cable goes through the packer for provision of sensors to some well zones.
EFFECT: increase of system operation efficiency and collection of measurement data referred to the well characteristics.
28 cl, 7 dwg
Title |
Year |
Author |
Number |
WELL SYSTEM AND METHOD FOR PROCESSING UNDERGROUND FORMATION |
2005 |
- Gud Piter A.
- Verkemer Klod Zh.
|
RU2293842C2 |
DEVICE AND METHOD FOR UNDERGROUND WELL COMPLETION |
2005 |
|
RU2307920C1 |
CONTROL FACILITIES EMPLOYED AT PRODUCTION OF FLUIDS BY HEATING AND OPERATED IN REAL TIME IN PRODUCING WELL |
2007 |
|
RU2341652C1 |
METHOD FOR PERFORMING WELL OPERATIONS USING SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMPS, AND SYSTEM FOR METHOD'S IMPLEMENTATION |
2008 |
|
RU2469182C2 |
METHOD FOR DEPLOYING INTEGRATED COMPLETION CASE IN ONE RIDE AND COMPLETION SYSTEM |
2019 |
- Trisal Krishna
- Afandiev Farid
- Molyavi Said
- Afanaseva Ilyana Sergeevna
|
RU2799592C2 |
METHOD OF EXTRACTING FLUID FROM RESERVOIR OF ONE WELL WITH ELECTRIC DRIVE PUMP EQUIPPED WITH ELECTRIC VALVE AND INSTALLATION FOR IMPLEMENTATION OF THIS METHOD |
2008 |
- Leonov Vasilij Aleksandrovich
- Sharifov Makhir Zafar Ogly
- Sagalovskij Vladimir Iosifovich
- Govberg Artem Savel'Evich
- Sagalovskij Andrej Vladimirovich
- Misho Solesha
- Sal'Manov Rashit Gilemovich
- Leonov Il'Ja Vasil'Evich
|
RU2385409C2 |
ENERGY TRANSMISSION MECHANISM FOR A CONNECTION UNIT OF A BOREHOLE |
2017 |
- Stil, Devid, Dzho
- Godager, Ojvinn
- Chzhun, Syaoguan, Allen
|
RU2744466C1 |
METHOD FOR PROVIDING FOR CONNECTION BETWEEN SHAFT OR SHAFTS OF SIDE BRANCH WITH BARE MAIN SHAFT OF WELL AND DEVICE FOR REALIZATION OF SAID METHOD, SYSTEM FOR COMPLETING WELL HAVING SIDE BRANCH, METHOD FOR CONNECTING EQUIPMENT OF MAIN SHAFT OF WELL TO EQUIPMENT OF SIDE SHAFT AND DEVICE FOR REALIZATION OF SAID METHOD |
1999 |
- Omer Ehrve
- Brokman Mark
- Gotlib Mikhail
- Frels Majkl V.
|
RU2239041C2 |
SYSTEM AND METHOD FOR WELL PRODUCTION OPTIMISATION |
2008 |
- Kannan Dkhandajutkhapani
- Sask Dehvid I.
- Chzhan' Lan
- Fajlas Dzhejms Dzh.
|
RU2520187C2 |
ENERGY TRANSFER MECHANISM FOR CONNECTING NODE OF BOREHOLE |
2017 |
- Stil, Devid Dzho
- Godager, Ojvinn
- Chzhun, Syaoguan Allen
|
RU2761941C2 |