FIELD: oil and gas industry.
SUBSTANCE: method includes separate trip in hole of pipe string with packer system equipped with at least one packer, sensor packages to control formation parameters with at least one sensor package controlled by electric or electromechanical valves regulating or shutting off fluid from formations to the well or at least from one extracted formation, downhole disconnectable wet contact unit which is electrically and mechanically connected in the lower part, at least one electrical line for communication control, power supply and data transfer which connects operation control sensors and electric or electromechanical valves with lower part of disconnectable wet contact unit, installation of packer system in production string to disconnect operated formation.
EFFECT: increasing automation efficiency of well operation control system.
5 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
FORMATION CUT-OFF PROCEDURE FOR WORK OVER WITHOUT WELL KILL OPERATION | 2013 |
|
RU2531011C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
METHOD OF EXTRACTING FLUID FROM RESERVOIR OF ONE WELL WITH ELECTRIC DRIVE PUMP EQUIPPED WITH ELECTRIC VALVE AND INSTALLATION FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2385409C2 |
OIL-WELL OPERATION UNIT | 2013 |
|
RU2538010C2 |
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2546218C1 |
METHOD FOR UNDERGROUND WELL REPAIR FOR REPLACEMENT OF DOWNHOLE PUMPING EQUIPMENT WITHOUT ACTION ON FORMATION | 2015 |
|
RU2592903C1 |
METHOD FOR UNDERGROUND WELL REPAIR TO REPLACE SUBMERSIBLE EQUIPMENT AND EXCLUDE INFLUENCE OF WELL-KILLING FLUID ON PRODUCTIVE PLAST | 2016 |
|
RU2623750C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION | 2011 |
|
RU2485293C1 |
UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF FORMATIONS | 2018 |
|
RU2724084C2 |
Authors
Dates
2013-12-10—Published
2011-12-08—Filed