FIELD: construction.
SUBSTANCE: invention relates to land management, land use and to power engineering. Method is provided to commercialise unused and unfit sections of Earth surface, due to reasons of natural origin or anthropogenic activity. A list of such territories is provided. Method provides for arrangement of power generating unit on pile footing at such sections. Power generating unit is formed by driving piles into ground over the level of maximum water lift, snowdrifts and other local obstacles, on which horizontal platform is erected, being an open turbine room for electric machine installed in its centre, rotor of which is provided with air drive made of radial carriers, with traction motors in horizontal plane, to support carriers during downtime, a circular race is arranged also on piles. Produced electric energy is used at site or transmitted.
EFFECT: method makes it possible to commercialise absolutely unpromising sections of Earth surface, of colossal area, from polar circle to equator, practically with year-round efficient return.
3 cl
Title | Year | Author | Number |
---|---|---|---|
AIR POWER PLANT | 2008 |
|
RU2396459C1 |
ELECTROMOTIVE FORCE SOURCE | 2002 |
|
RU2245457C2 |
DISTRIBUTED THERMAL POWER PLANT AND DEVELOPMENT METHOD OF IT | 2009 |
|
RU2434106C2 |
METHOD FOR DEVELOPMENT OF POWER PLANT | 2008 |
|
RU2398069C1 |
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS | 2022 |
|
RU2779168C1 |
MULTIFUNCTIONAL STRUCTURE | 2015 |
|
RU2606718C2 |
HYDRAULIC ACCUMULATING POWER PLANT WITH UNDERGROUND LOCATION OF BOTTOM POND AND METHOD OF BOTTOM POND TUNNELLING | 2011 |
|
RU2499096C2 |
MULTI-FUNCTIONAL STRUCTURE | 2012 |
|
RU2511067C1 |
METHOD FOR CONSTRUCTION OF OIL AND GAS WELL ON LAND | 2019 |
|
RU2723794C1 |
TRANSPORT AND LOGISTIC SYSTEM OF THE CITY | 2016 |
|
RU2616644C1 |
Authors
Dates
2010-08-27—Published
2008-12-26—Filed