FIELD: construction; oil and gas industry.
SUBSTANCE: invention relates to construction of oil and gas wells on land, in particular, to methods for optimization of environmentally safe eradication of earth drums-accumulators of drilling wastes. Water surface of earth drill-accumulator of drilling wastes is subjected to treatment by high-speed and high-temperature horizontal jet of off-gases, directed parallel to water surface in barn and with clearance from turbojet engine, arranged on high-flotation road chassis, moves clockwise with the outside perimeter of the precoat earthen embankment barn drive drilling waste and parallel to a tapped to barn 45…90° turbojet engine in a horizontal plane from the axis of the automobile chassis forming a closed circuit. Treatment of water surface by high-speed and high-temperature horizontal jet of off-gases of turbojet engine is carried out after dismantling and removal from drilling site of drilling equipment and associated installations, removal from the water surface of the earth pit of the oil film, protection of the wellhead of the drilled productive well with heat-resistant shields from the heat action of exhaust gases of the turbojet engine.
EFFECT: higher environmental safety, reduced time of erection of storage bunker.
1 cl, 2 dwg
Authors
Dates
2020-06-17—Published
2019-11-05—Filed