FIELD: oil and gas production.
SUBSTANCE: invention relates to oil industry and may find application in well repair. Pipe string is lowered into well, volume of isolating substance is pumped by circulation into interval of production string integrity damage, isolating substance is pushed into breaches, and then remains of isolating substances and pipe string are removed from well. Previously pipe string is equipped with anti-adhesion coating, in pipe string pipes are selected from existing range to locate in breach interval with external diametre that is most close to inner diametre of well production string, isolating substance is represented by low-viscosity solution, operations of pumping, driving and removal of isolating substance are repeated until production string integrity breaches are eliminated.
EFFECT: method makes it possible to repair well production string with integrity breaches by holes of small diametre and injectability of isolating compositions in breaches interval.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL REPAIR | 2008 |
|
RU2354804C1 |
WELL REPAIR METHOD | 2012 |
|
RU2498045C1 |
WELL REPAIR METHOD | 2004 |
|
RU2280754C1 |
METHOD OF ELIMINATION OF LEAKAGE OF PRODUCING WELL COLUMN | 2007 |
|
RU2340761C1 |
METHOD OF ELIMINATION OF LOWER BOREHOLE ANNULUS CIRCULATION IN WELL | 2007 |
|
RU2340760C1 |
METHOD OF INSULATING WORKS IN PRODUCTION WELL | 2009 |
|
RU2389865C1 |
ACID TREATMENT METHOD OF BOTTOMHOLE ZONE OF CLUSTER WELL | 2019 |
|
RU2713027C1 |
INJECTION WELL REPAIR METHOD | 2007 |
|
RU2323324C1 |
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 |
|
RU2584256C1 |
WELL REPAIR METHOD | 2011 |
|
RU2483193C1 |
Authors
Dates
2010-08-27—Published
2009-10-20—Filed