METHOD FOR DEVELOPMENT OF ORE BODIES IN ZONES OF ORE CONTACT AND OVERBURDEN BY SUBBENCHES Russian patent published in 2010 - IPC E21C41/26 

Abstract RU 2398111 C1

FIELD: mining.

SUBSTANCE: invention relates to mining industry and may be used in development of mineral deposits by open method. Method includes separation of payout bed in zones of contact into subbenches with height that depends on angle of ore body inclination, its thickness, and development from drilling of wells at the side of lying wall of deposit at the distance from contact along horizontal line, corresponding to minimum area of shed triangle of ore, and further two layers of wells as bench is separated into two subbenches with angle of ore body drop of 25-30° are drilled with depth with slight subdrilling of contact surface, and the last row of wells on the side of lying wall of deposit is drilled with depth for the whole height of bench with required subdrilling to minimise area of ore triangle included into ore mass. And at the side of hanging wall of deposit such area of ore triangle is achieved by laying a trench from the side of hanging wall with depth that corresponds to height of upper subbench, and after its tunneling lower payout bed for minimisation of ore losses is developed by drilling of the first and second row wells by ore from the side of hanging wall of deposit, and diluted ore mass after drilling and explosion of walls in the 3rd and 4th rows in zone of trench bottom is removed and stacked into dump of noncommercial ores. As angle of deposit inclination increases up to 40-45°, operations of bench height division into subbenches and trench arrangement by drilling of wells on the side of lying wall, and then hanging wall, are repeated, besides in case it is impossible to arrange a trench on the side of hanging wall, the first row of wells on the side of hanging wall of deposit is drilled near contact of ore with rock in development of ore in layer of the first subbench, and after its explosion and removal the 2nd and 3rd rows are drilled in overburden rocks, and after explosion and removal of rock, wells are drilled in payout bed of the 2nd, 3rd subbenches so that a common slope of bench could be arranged for its whole height.

EFFECT: reduction of ore losses and its dilution 2-3 times.

1 ex, 7 dwg

Similar patents RU2398111C1

Title Year Author Number
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCE DEPOSITS 2005
  • Eremin Georgij Mikhajlovich
RU2304720C1
STRIP MINING OF MINERALS INCLUDING WORKING OF ORE BODIES IN CONTACT BETWEEN ORE AND CAPPING IN SUB-BENCHES 2013
  • Fomin Sergej Igorevich
  • Semenov Aleksandr Sergeevich
  • Marinin Mikhail Anatol'Evich
  • Shevelev Vitalij Alekseevich
  • Komarov Jurij Al'Bertovich
RU2524716C1
METHOD TO MINE MINERAL DEPOSITS 2010
  • Eremin Georgij Mikhajlovich
RU2443864C1
METHOD FOR OPEN MINING OF MINERAL RESOURCES DEPOSITS 2008
  • Eremin Georgij Mikhajlovich
RU2377407C1
METHOD OF EXPLOSIVE PREPARATION OF MOUNTAIN MASS TO SELECTIVE EXCAVATION 2017
  • Kornev Kirill Leonidovich
  • Marinin Mikhail Anatolevich
  • Babkin Ruslan Sergeevich
RU2653172C1
METHOD FOR OPENCAST MINING OF SOLID MINERALS 1990
  • Mining S.Eh.
  • Elin A.N.
  • Chmykhalov V.S.
  • Puzenko A.S.
  • Gusev V.P.
RU2015330C1
OPEN-CUT MINERAL DEPOSIT MINING METHOD 2004
  • Eremin G.M.
RU2258811C1
METHOD FOR OPEN PIT MINERAL MINING 2004
  • Eremin Georgij Mikhajlovich
RU2282721C2
METHOD FOR EXTRACTING MINERAL RESOURCES DEPOSITS 2003
  • Eremin G.M.
RU2241119C1
PROCEDURE FOR OPEN PIT DEVELOPMENT OF MINERAL DEPOSITS 2009
  • Eremin Georgij Mikhajlovich
RU2394158C1

RU 2 398 111 C1

Authors

Eremin Georgij Mikhajlovich

Dates

2010-08-27Published

2009-04-08Filed