FIELD: machine building.
SUBSTANCE: invention refers to connectors for hinged connection of the first and second pipelines, particularly first and second pipelines of system of hot air supply from engine on aircraft, facilitating additional compensation of gap. The end of the first pipeline is hinged with the end of the second pipeline by means of a connecting rod so, that there is formed a gap between them. Opposite ends of the pipes are enveloped with a packing device, in particular with metal bellows to pack the gap; the first end of the connecting rod is equipped with an adjusting device to control length of the rod. As the control device is positioned on the end of the rod, assembly of the connecting facility becomes easier; notably, a detachable pipe connection is facilitated in the zone of the pipe end of the first pipeline.
EFFECT: invention can be implemented without technical maintenance under conditions of transporting mediums of high temperature and pressure.
10 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR DETERMINING DRILL TOOL POSITION RELATIVE TO WORKPIECE PLANE | 0 |
|
SU1114494A1 |
TUYERE DEVICE FOR SUPPLYING BLAST GAS INTO BLAST FURNACE | 1991 |
|
RU2039838C1 |
MOBILE UNIT FOR SUCTION AND/OR SUPPLY OF GAS | 1994 |
|
RU2100105C1 |
METHOD AND DEVICE FOR MOUNTING PLASTIC PIPE | 1995 |
|
RU2117209C1 |
LIQUID PROPELLANT ROCKET ENGINE UNIT | 2014 |
|
RU2563596C1 |
0 |
|
SU320097A1 | |
FACILITY FOR HINGED CONNECTION OF PIPES | 2006 |
|
RU2388957C2 |
PIPES CONNECTION DEVICE | 2008 |
|
RU2499939C2 |
EXPANSION JOINT | 2014 |
|
RU2561816C1 |
MACHINE TOOL FOR MOUNTING TOOL RELATIVE TO BLANK | 1990 |
|
RU2076020C1 |
Authors
Dates
2010-09-20—Published
2006-05-26—Filed