FIELD: machine building.
SUBSTANCE: underwater structure (1) contains at least two guide elements (11, 12). The first pipeline (22) is provided with the first anchor device (28). Female end of pipe (3) is provided with the second anchor device (4). The device contains power-driven tool (60) for pipelines connection, receiving part (3 2), two guides and control sections (34, 35) branching from receiving part (3 2) and drive (40). Receiving part (32) has U-shaped profile with slot (33) for interaction with the first anchor device (28) and it supports the end of the first pipeline (22) with possibility of sliding movement. Ends of guides and control sections (34, 35) are provided with joining parts (36, 37) mating with guide elements (11, 12). Drive (40) has the first and the second fasteners (42, 44) for joining with the second and the first anchor devices (4, 28).
EFFECT: reducing quantity of parts and simplifying functioning.
13 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR CONNECTING UNDERWATER PIPELINES | 2020 |
|
RU2749624C1 |
UNDERWATER DEVICE (VERSIONS) AND PROCEDURE FOR TRANSPORTING WELL FLUID | 2007 |
|
RU2416712C2 |
UNDERWATER CONNECTION DEVICE AND METHOD OF CONNECTION OF PIPELINE | 2024 |
|
RU2824696C1 |
DEVICE FOR REHABILITATION OF DESTRUCTED DEEP-WATER PIPELINES | 2010 |
|
RU2468274C2 |
CRANE-MANIPULATOR SLEWING CIRCLE | 2001 |
|
RU2230699C2 |
MECHANISM FOR CONNECTING DEVICE FOR HORIZONTAL CONNECTION | 2010 |
|
RU2542727C2 |
CONNECTING DEVICE FOR HORIZONTAL CONNECTION | 2010 |
|
RU2539413C2 |
CRANE-MANIPULATOR UNIT | 2002 |
|
RU2240971C2 |
METHOD OF CLEANING FLEXIBLE PIPELINES USING FLEXIBLE HOSE FROM FIELD DRILLING RIG | 2020 |
|
RU2818350C1 |
CRANE-MANIPULATOR PLANT SLEWING GEAR POST | 2001 |
|
RU2213043C2 |
Authors
Dates
2013-11-27—Published
2008-12-19—Filed