FIELD: construction.
SUBSTANCE: device for compaction of soil in drilled pile well bottomhole includes casing pipe, bushing fixed on it with working element pulled through it. Working element is arranged in the form of hollow pipe, at the lower end of which there is a thrust journal and sealing attachment, and at the upper end there are upper and lower supports and inertial mass, placed on hollow pipe between upper and lower supports with sliding fit.
EFFECT: improved bearing capacity of drilled piles erected in watered and soft soils.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208088C2 |
METHOD OF AUGER PILES INSTALLATION | 2015 |
|
RU2575190C1 |
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
METHOD OF ERECTING CAST-IN-PLACE PILE IN BULGING SOIL | 0 |
|
SU881254A1 |
METHOD FOR CONSTRUCTING BORED PILE IN SOIL | 2023 |
|
RU2804651C1 |
DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS | 2010 |
|
RU2415228C1 |
METHOD OF CONSTRUCTING CAST-IN-PLACE PILES | 0 |
|
SU903473A1 |
PROCESS OF ERECTION OF PILE IN GROUND | 2001 |
|
RU2208089C2 |
DEVICE FOR FORMATION OF WELLS FOR AUGER PILES | 2011 |
|
RU2483165C1 |
METHOD OF MANUFACTURING CAST-IN-PLACE PILE | 0 |
|
SU1608293A1 |
Authors
Dates
2010-10-20—Published
2008-10-01—Filed