METHOD FOR INSTALLATION OF PIPELINE THAT CONNECTS UNDERWATER DEPOSIT TO PLATFORM, FROM OFFSHORE PRODUCTION UNIT Russian patent published in 2010 - IPC E21B43/01 F16L1/12 

Abstract RU 2403378 C2

FIELD: mining.

SUBSTANCE: invention includes arrangement of the first vessel over hydrocarbon well, fixation of pipeline to pump hydrocarbons at the first vessel to the first end fixed to launching gear at the first vessel, fixation of the second end of pipeline to the second vessel arranged near the first vessel, pipeline lowering with the help of launching gear, increasing distance between the second vessel and the first vessel after displacement of the second vessel in direction of the third vessel anchored at the distance from the first vessel, and pipeline drawing until the second vessel is not near the third vessel. Provision of pipeline section contact with sea bottom at the position between the first and second ends of pipeline, displacement of the second end of pipeline at the distance from the first vessel, in direction of pumping pipe length, exceeding distance between the first vessel and anchor position of the third vessel, return of the second end of pipeline to anchor position of the third vessel, and establishment of hydraulic link of the second end of pipeline with the third vessel.

EFFECT: invention eliminates necessity of using special pipe-lay ships, makes it possible to accurately control angle of incline in pipelines that connect underwater deposit to a platform, fixed to surface vessel or to submersible buoy.

14 cl, 18 dwg

Similar patents RU2403378C2

Title Year Author Number
UNDERWATER PRODUCTION SYSTEM WITH SUPPORT TOWER OF STRUCTURE FOR PRODUCTION IN ARCTIC 2011
  • Brinkmann Karl R.
  • Matskevich Dmitrij G.
RU2583028C2
DEEPWATER PRODUCTION SYSTEM 2014
  • Eje Rolf
RU2655011C2
SYSTEM AND VESSEL FOR TECHNICAL SERVICING OF OFFSHORE DEPOSITS 2005
  • Krossli Kehlvin U.
  • Fauler Trejsi A.
  • Glasskok M. Sidni
  • Grir Mehtt'Ju N.
  • Lokken Roald T.
  • Pedzhaver Dinesh R.
  • Uilson U. Brett
  • Jost Dehvid B.
RU2330154C1
METHOD OF DEVELOPMENT OF HYDROCARBONS /OIL AND GAS/ AND UNDERWATER DRILLING RIG FOR IMPLEMENTATION OF THIS METHOD IN ARCTIC SHELF 2008
RU2380541C2
DETACHABLE MOORING TURNTABLE SYSTEM WITH ROTARY PLATFORM 2009
  • Bro Zhan
  • Benua Zhan-P'Er
  • Meli Sesil'
  • Bodjuehn Kristian
RU2489300C2
ICE RESISTANT DRILLING COMPLEX FOR SHALLOW CONTINENTAL SHELF DEVELOPMENT 2008
  • Antonov Vladimir Sergeevich
  • Gorshkov Igor' Anatol'Evich
  • Trapeznikov Jurij Mikhajlovich
RU2382849C1
ICE-RESISTANT SUPPORT BLOCK OF SEA DRILLING PLATFORM AND METHOD FOR MOUNTING THEREOF AT CONTINENTAL SHELF BOTTOM 2002
  • Ljubimtsev Vladimir Aleksandrovich
  • Ladygina Irina Mikhajlovna
  • Ryzhakov Nikolaj Nikolaevich
  • Tarasenko Irina Ivanovna
RU2249079C2
DRILLING METHOD IN ARCTIC CONDITIONS 2016
  • Madsen Jens Jorgen
RU2704403C2
METHOD OF INDUSTRIAL COMPLEX UNDERWATER EXPLOITATION OF SEA FIELDS 1991
  • Leshchev A.G.
  • Ehdelev O.K.
  • Shustikov Ju.K.
RU2014243C1
METHOD FOR DEVELOPMENT OF HYDROCARBON DEPOSITS ON SUPER-SHALLOW SHELF (SEA DEPTH = 1,1-1,3 M) 2008
  • Lavkovskij Stanislav Aleksandrovich
  • Morozov Andrej Valer'Evich
  • Ovchinnikov Viktor Fedorovich
  • Subbotin Aleksej Aleksandrovich
  • Ehdelev Oleg Konstantinovich
RU2392171C2

RU 2 403 378 C2

Authors

Pollak Dzhek

Ville Khejn

Dates

2010-11-10Published

2006-06-29Filed