FIELD: mining.
SUBSTANCE: invention can be used in development of potassium deposits. Development method involves delineation of extraction block development drifts, deposit unit chambers with leaving of inter-chamber yielding pillars, driving of preparatory drift fork boards production machine check-out starting from bottom layer cuts Sylvinite. Development is performed in layers, cut Sylvinite output on surface, and spent halite is used as filling material. After development of first layer of Sylvinite along length of the chambers are perforated pipes, developed layer halite with piling directly in space of chamber, forced by perforated pipes in loosened hydrochloric array of wastes from Sylvinite. After formation of consolidated array is developed in above sequence located above layers Sylvinite and salt.
EFFECT: invention allows to increase efficiency of development unit.
1 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF THICK GENTLY SLOPING POTASSIUM BEDS | 2014 |
|
RU2585318C1 |
METHOD FOR THICK GENTLY SLOPING POTASSIUM FORMATION DEVELOPMENT | 2004 |
|
RU2272137C1 |
DEVELOPMENT OF THICK FLAT-LYING POTASH BEDS | 2014 |
|
RU2567576C1 |
METHOD FOR THICK FLAT-LAYING POTASSIUM SEAM DEVELOPMENT | 2006 |
|
RU2310074C1 |
METHOD FOR EXTRACTION OF MASSIVE SLOPING POTASSIUM BEDS | 2004 |
|
RU2254472C1 |
PROCESSING OF POTASSIC SEAMS | 2013 |
|
RU2524084C1 |
PROCESSING OF POTASSIC SEAMS BY COMBINED TECHNOLOGY | 2013 |
|
RU2524093C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF DEVELOPMENT OF THICK SLOPING POTASSIUM BED WITH ROCK SALT INTERBED | 2009 |
|
RU2421616C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING POTASSIUM BEDS | 2010 |
|
RU2435957C1 |
Authors
Dates
2016-05-20—Published
2014-12-09—Filed