FIELD: instrument making.
SUBSTANCE: invention refers to funeral accessories, and particularly to a floor beam for land burial in a coffin. The U-sectioned floor beam for land burial in a coffin in a ground comprises at least one burial place to lower a coffin with a deceased and land fill.
EFFECT: intensified utilisation of cemeteries under construction or reconstructed.
7 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CINERARIUM STRUCTURE (VERSIONS) | 2009 |
|
RU2404337C1 |
ARRANGEMENT OF STATIONARY UNDERGROUND MULTI-LEVEL VAULTS | 2011 |
|
RU2484222C2 |
MEMORIAL MONUMENT | 2001 |
|
RU2206684C1 |
CAPSULE FOR TEMPORARY STORAGE, TRANSPORTATION AND BURYING OF HUMAN AND ANIMAL CORPSES IN WATER-SATURATED GROUND AND UNDER MEGALOPOLIS CONDITIONS ON CLOSED CEMETERY TERRITORIES | 2005 |
|
RU2268582C1 |
TOMBSTONE RELOCATABLE MONUMENT AND METHOD OF ITS ASSEMBLY | 2017 |
|
RU2667384C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
BIOLOGICALLY-ACTIVE PREPARATION, ACCELERATING MINERALIZATION OF REMAINS, AND ACCELERATION METHOD OF REMAINS MINERALIZATION BY BIOLOGICALLY ACTIVE PREPARATION (VERSIONS) | 2015 |
|
RU2639729C2 |
METHOD TO RESTORE MINED PITS FOR CONSTRUCTION OF CEMETERY | 2012 |
|
RU2496983C1 |
COFFIN | 0 |
|
SU1836945A1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448252C1 |
Authors
Dates
2010-11-20—Published
2009-09-08—Filed