FIELD: mining.
SUBSTANCE: method includes filling of the mined space to the border of the upper level of ground water with construction wastes, arrangement of the drainage layer with construction wastes, formation of a hill in the centre of the pit by dumping of stripping rocks with subsequent terracing of hill slopes and arrangement of places for burial of remains, at the same time underground tomb structures are arranged on terraces, being designed for several graves, besides, each tomb structure is made with hydraulic insulation, drainage system, drainage and ventilation systems, at the same time the ventilation system is additionally equipped with a separate air duct installed with an angle of inclination of not more than 35 degrees and made in the form of a hollow vertical channel filled with stems of cane located in the ground in close proximity from the tomb structure with the possibility to connect each subsequent grace to it in the tomb structure.
EFFECT: reduced labour costs and costs of recovery works, rational usage of land.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO RESTORE MINED-OUT QUARRIES FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2011 |
|
RU2491423C2 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448251C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY-MUSEUM | 2010 |
|
RU2448252C1 |
METHOD TO RECOVER ABANDONED PITS | 2010 |
|
RU2443865C1 |
METHOD TO RECOVER ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2011 |
|
RU2487241C1 |
METHOD FOR RECLAMATION OF WORKED-OUT PITS | 2010 |
|
RU2442896C1 |
RECOVERY METHOD OF MINED-OUT PITS FOR CONSTRUCTION OF CEMETERY | 2015 |
|
RU2611749C1 |
METHOD TO RESTORE ABANDONED PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2529037C1 |
METHOD TO RESTORE BARROW PITS FOR CONSTRUCTION OF CEMETERY | 2013 |
|
RU2515012C1 |
METHOD OF RECONSTRUCTION OF BARROW PITS FOR BUILDING OF CEMETERY | 2016 |
|
RU2654906C2 |
Authors
Dates
2013-10-27—Published
2012-05-15—Filed