FIELD: construction.
SUBSTANCE: method includes cutting trees and shrubs from edge, slops and bottom of canal, cultivation of sediment load with arrangement of banks. dehydration and levelling of banks. Canal is cleaned serially on sections between inflowing drains at the same time prior to cultivation of sediment load behind the edge along the canal, pits are arranged with length equal to distance between drains, arranging them with displacement relative to axis of drain towards the next drain and inclination in direction of canal cleaning, groove is arranged in pit over the drain for the width of pit with inclination towards canal, groove is connected to drain by vertical water-receiving funnel, cut trees and shrubs are ground and laid onto pit bottom, groove and water-receiving funnel are also filled with this mix, afterwards cultivated sediment load is evenly laid into pit, and surface of banks is covered with topsoil.
EFFECT: invention increases fertility of soils on surface of bank and accelerates dehydration of laid sediments.
4 dwg
Authors
Dates
2010-12-10—Published
2009-08-03—Filed