METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE Russian patent published in 2023 - IPC E02D29/45 

Abstract RU 2800171 C1

FIELD: underground structures.

SUBSTANCE: method for constructing an underground structure includes formation of two rows of enclosing elements in the ground between the structure under construction and the existing one. Before excavating the foundation pit, the first row of enclosing elements is installed using a drilling rig along its perimeter in the form of a wall of secant piles to a depth not less than the depth of the structure being erected, then, using a vibratory driver, the second row of enclosing elements is installed in the form of a sheet piling, consisting of a sheet pile profile, at a distance of 3 to 10 m from the first row of enclosing elements, to a depth equal to the depth of the first row of enclosing elements. The diameter of the secant piles, the size of the sheet pile profile, and the distance between them are determined by calculation to ensure the necessary rigidity of the enclosing structure and to reduce the impact of construction on the surrounding buildings. Then, all the heads of the secant piles are bound together with a steel belt at the top and connected to sheet piling at the top using steel rolled profiles. Further development of the soil is carried out in tiers along the height of the pit with installation of buntons, if necessary. Then a structure is erected in the created pit. After completion of construction, the second row of enclosing elements and the rolled steel profiles are removed for reuse.

EFFECT: improved the quality of construction by limiting soil migration from under the foundations of existing buildings during construction in constrained urban environments, by reducing settlement of the adjacent structures, increasing bending resistance and displacement resistance of the enclosing elements towards the created pit.

1 cl, 6 dwg

Similar patents RU2800171C1

Title Year Author Number
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE 2009
  • Karpov Andrej Viktorovich
RU2414563C1
PROCESS OF ERECTION OF ENCLOSING WALL IN GROUND 2001
  • Chernjakov A.V.
  • Chernjakov V.G.
  • Kaeshkov S.D.
  • Kozlov I.V.
  • Poderegin A.N.
  • Smagin Ju.N.
RU2204656C1
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA 2002
  • Petrukhin V.P.
  • Shuljat'Ev O.A.
  • Mozgacheva O.A.
RU2245966C2
PROCESS OF DEVELOPMENT OF FOUNDATION PIT 2002
  • Chernjakov A.V.
  • Bogomolova O.V.
  • Varygin V.N.
  • Volynets A.Z.
  • Kaeshkov S.D.
  • Kal'Ko A.V.
  • Kozlov I.V.
  • Tsykin B.A.
RU2209268C1
METHOD OF UNDERGROUND STRUCTURE ERECTION IN URBAN BUILT-UP AREA 2002
  • Petrukhin V.P.
  • Shuljat'Ev O.A.
  • Mozgacheva O.A.
RU2245428C2
METHOD OF CONSTRUCTION OF UNDERGROUND STRUCTURE 1994
  • Mikhlin A.L.
  • Rubtsov N.I.
  • Shubin O.Sh.
  • Ort A.I.
  • Krestovozdvizhenskij V.V.
  • Ganis V.E.
RU2042013C1
METHOD FOR EXISTENT BUILDING, BUILDING STRUCTURE AND UNDERGROUND SERVICE LINE PROTECTION IN CONSTRUCTION AFFECTED ZONE 2005
  • Petrukhin Valerij Petrovich
  • Isaev Oleg Nikolaevich
RU2291253C1
METHOD FOR CONSTRUCTION OF UNDERGROUND STRUCTURE 2012
  • Protosenja Anatolij Grigor'Evich
  • Lodus Evgenij Vasil'Evich
  • Demenkov Petr Alekseevich
RU2486318C1
METHOD FOR DEPTH COMPENSATION COMPACTION OF SOIL 2009
  • Bakholdin Boris Vasil'Evich
  • Bobkov Sergej Vladimirovich
  • Eremin Valerij Jakovlevich
  • Eremin Aleksej Valer'Evich
  • Rajanov Sergej Fadusovich
  • Sarafanov Nikolaj Viktorovich
  • Siguta Jurij Vasil'Evich
  • Taturin Aleksandr Jur'Evich
  • Tikhonov Mikhail Sergeevich
  • Jastrebov Petr Ivanovich
RU2405890C1
STAY-IN-PLACE FORM FOR ERECTION OF WALLS IN SOIL 2011
  • Mangushev Rashid Abdullovich
  • Sapin Dmitrij Aleksandrovich
RU2482243C1

RU 2 800 171 C1

Authors

Demenkov Petr Alekseevich

Khoziainov Dmitrii Mikhailovich

Smirnova Olga Mikhailovna

Davidenko Lada Ruslanovna

Dates

2023-07-19Published

2022-12-07Filed