FIELD: oil and gas production.
SUBSTANCE: method for doing repair-isolation works under conditions of intense absorption includes injection of phosphogypsum suspension and liquid sodium glass into absorption interval. At the same time edging of 1-3 m3 of oil-acid emulsion is previously pumped into well, and then serially equal amounts of liquid sodium glass and 50% aqueous suspension of phosphogypsum are pumped in 1-4 cycles with total volume of single cycle from 4 to 8 m3 with intermediate pumping of fresh water buffer in between.
EFFECT: improved efficiency of repair-isolation works under conditions of intense absorption.
2 cl, 2 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR LIQUIDATION OF ABSORPTION ZONES IN WELL | 2010 |
|
RU2405927C1 |
METHOD TO INSULATE ABSORPTION ZONE IN WELL | 2010 |
|
RU2447258C1 |
METHOD OF REPAIR AND INSULATION OPERATIONS IN A WELL | 2016 |
|
RU2618539C1 |
METHOD OF REPAIR-INSULATION WORKS IN WELL (VERSIONS) | 2015 |
|
RU2599154C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2014 |
|
RU2580534C1 |
METHOD OF WATER SUPPRESSION IN HORIZONTAL WELL WITH WATERED CARBONATE BASINS | 2013 |
|
RU2519138C1 |
WATER INFLOW ZONES CEMENTING METHOD | 2013 |
|
RU2533997C1 |
INSULATION METHOD OF WATER INFLUX AND WELL THIEF ZONE | 2008 |
|
RU2378490C1 |
COMPOUND FOR ISOLATION OF WATER INFLOW AND ABSORBING ZONES IN WELL, AND ITS APPLICATION METHOD | 2011 |
|
RU2483093C1 |
Authors
Dates
2010-12-10—Published
2009-10-13—Filed