FIELD: oil and gas industry.
SUBSTANCE: method comprises preparing and cyclic injection of gel-forming agent and liquid glass in the deformation interval. A slurry of ground anhydrite is used as gel-forming agent. The injectability of the insulated interval is pre-determined, and a ground anhydrite slurry is prepared in fresh water at the water-solid ratio of 0.8-1. Depending on the injectability of the insulated interval, from 1 to 15 cycles of ground anhydrite and liquid glass slurry in the volume ratio of 1:1 is pumped into the isolated borehole. Each cycle includes a 1-5 m3of anhydrite ground slurry with addition of synthetic or basalt fiber in an amount 1-6 kg per1 m3 anhydrite slurry, 0.5-1 m3 buffer from fresh water,1-5 m3 liquid glass. Next, cement solution is pumped, dissolved from 2-5 tons of plugging portland cement. The well is left to respond for 24 hours. The diameter of the synthetic or basalt fiber is 10-35 mcm, and its length is 3-18 mm. Fiber is added during preparing or pumping of ground anhydrite slurry.
EFFECT: improved efficiency of the repair and insulation operations method, improved plugging capability and hardening of the obtained plugging stone with the use of a gel-forming agent.
1 tbl
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF REPAIR-INSULATION WORKS IN WELL (VERSIONS) | 2015 | 
 | RU2599154C1 | 
| METHOD FOR DOING REPAIR-ISOLATION WORKS UNDER CONDITIONS OF INTENSE ABSORPTION | 2009 | 
 | RU2405926C1 | 
| WATER INFLOW ZONES CEMENTING METHOD | 2013 | 
 | RU2533997C1 | 
| COMPOUND FOR ISOLATION OF WATER INFLOW AND ABSORBING ZONES IN WELL, AND ITS APPLICATION METHOD | 2011 | 
 | RU2483093C1 | 
| METHOD OF WELL WATER PRODUCTION ZONE ISOLATION | 2012 | 
 | RU2504640C1 | 
| METHOD FOR REPAIR INSULATION WORK USING SUSPENSIONS OF FINE MINERAL BINDER | 2015 | 
 | RU2582143C1 | 
| METHOD FOR LIQUIDATION OF ABSORPTION ZONES IN WELL | 2010 | 
 | RU2405927C1 | 
| INSTALLATION METHOD OF BRIDGE CUTTING OFF BELOW-LYING OIL FORMATION | 2012 | 
 | RU2494227C1 | 
| METHOD FOR LIMITING WATER INFLOW IN WELL | 2016 |  | RU2611794C1 | 
| PROCEDURE FOR REPAIR-ISOLATION OPERATIONS IN WELL | 2010 | 
 | RU2424418C1 | 
Authors
Dates
2017-05-04—Published
2016-05-31—Filed