FIELD: construction.
SUBSTANCE: pylon head of cable-braced bridge of combined system consists of external concrete part and metal anchor structure fixed in it, arranged in the centre of pylon and made composite along height from joined bearing elements, which are equipped with anchor protruding parts arranged at each level of cables anchoring. The novelty is the fact that bearing elements of composite metal anchor structure consist of side walls, being the bearing element of protruding anchor part and combined by means of vertical sheets and system of horizontal membranes. Side walls and vertical sheets have flexible rod supports embedded into concrete part of head, and combination of elements along height is arranged between vertical walls and sheets by means of joints of pads and high-strength bolts. Ends of anchor ledges may be equipped with additional transverse membranes.
EFFECT: increased operational reliability.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO EXPAND BRIDGE STRUCTURE USING CABLE SYSTEM | 2013 |
|
RU2539461C1 |
METHOD FOR GEOMETRIC PROVISION OF DESIGN ANGLE OF GUY FIXATION TO BRIDGE SPAN | 2007 |
|
RU2395639C2 |
ANCHORAGE UNIT FOR ROPES OF GUY-ROPE BRIDGE | 0 |
|
SU992646A1 |
PRESTRAINED SPATIAL STRUCTURE | 0 |
|
SU981532A1 |
METHOD TO ERECT BASE PIER SECTION OF CABLE TRUSS BRIDGE SPAN CABLE-STAYED GIRDER AND PILOT BEAM TO REALISE THIS METHOD | 2011 |
|
RU2460838C1 |
METHOD AND APPARATUS FOR MOUNTING THE ROPES OF GUYS OF GUY BRIDGE | 0 |
|
SU939626A1 |
METHOD TO EXPAND BRIDGE CLEARANCE USING CABLE-STAYED SYSTEM | 2013 |
|
RU2539466C1 |
STAY-TYPE BRIDGE | 1997 |
|
RU2133791C1 |
GUY-ROPE SUSPENSION BRIDGE | 0 |
|
SU804753A1 |
GUY-ROPE BRIDGE MOUNTING METHOD | 0 |
|
SU1084354A1 |
Authors
Dates
2010-12-20—Published
2009-10-21—Filed