FIELD: construction.
SUBSTANCE: method includes installation of additional elements: amplifying crossbars, pylons, additional transverse and longitudinal beams and cable guys; which are combined with elements of the existing bridge structure. At first the upper part of each support is reinforced with a reinforcing crossbar, afterwards pylons are installed in pairs with crosspieces in the upper part of pylons on side protruding parts of the lower parts of supports, in the area of main vertical beams. Then they install additional transverse beams and cover them with additional longitudinal beams, then they install devices for fastening of cable guys, afterwards they tighten and fix cable guys, and then lay the door surface and install barriers.
EFFECT: invention provides for the possibility to expansion and reinforcement of a bridge structure without termination of its operation.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
WIDENING STRUCTURE FOR BRIDGE CONSTRUCTION | 1993 |
|
RU2046879C1 |
METHOD TO EXPAND BRIDGE CLEARANCE USING CABLE-STAYED SYSTEM | 2013 |
|
RU2539466C1 |
METHOD FOR TRANSVERSE RELOCATION OF BRIDGE SUPERSTRUCTURE FOR EXTENDED COLLAR BEAM | 2014 |
|
RU2557020C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
PROCESS WIDENING BRIDGE STRUCTURE | 2001 |
|
RU2205914C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
FLOATING FERRY WITH FLOATING MODULE AND FLOATING SUPPORT WITH PYLON | 2018 |
|
RU2699198C1 |
METHOD AND UNIT FOR CONSTRUCTION OF EXPRESSWAY AND EXPRESSWAY | 2001 |
|
RU2181396C1 |
UNIVERSAL PORTABLE BRIDGE (UARM) | 2014 |
|
RU2580957C1 |
Authors
Dates
2015-01-20—Published
2013-10-09—Filed