FIELD: construction.
SUBSTANCE: method to expand a bridge clearance using a cable-stayed system, in process of which a split span is changed into a non-split span, is characterised by the fact that additional elements are installed, namely, traction rods, metal plates, then pylons with cable stays are installed. Traction rods are installed between adjacent beams of the split span and are fixed, then metal plates are installed in areas of connection of adjacent beams and a support crossbar, and they are combined with adjacent beams and crossbars of supports by means of an anchor joint. Then pylons are erected at both sides of the span, with a support against the area of ground under the bridge, afterwards cable stays are installed and tightened, and supports are dismantled.
EFFECT: increased reliability.
6 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO EXPAND BRIDGE STRUCTURE USING CABLE SYSTEM | 2013 |
|
RU2539461C1 |
REMOVAL METHOD OF GIRDER REINFORCED-CONCRETE SUPERSTRUCTURE OF BRIDGE USING CABLE-SUPPORTED SYSTEM | 2013 |
|
RU2534556C1 |
REMOVAL METHOD OF BRIDGE SUPERSTRUCTURE USING CABLE-SUPPORTED SYSTEM | 2013 |
|
RU2534557C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
UNIVERSAL PORTABLE BRIDGE (UARM) | 2014 |
|
RU2580957C1 |
FLOATING FERRY WITH FLOATING MODULE AND FLOATING SUPPORT WITH PYLON | 2018 |
|
RU2699198C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
BRANCHED PEDESTRIAN BRIDGE | 2009 |
|
RU2407849C1 |
BRIDGE RECONSTRUCTION METHOD USING TRANSVERSE RELOCATION OF EXISTING REINFORCED-CONCRETE SOLID SUPERSTRUCTURE | 2014 |
|
RU2556766C1 |
METHOD FOR DISASSEMBLY OF ARCH BRIDGE | 2022 |
|
RU2800582C1 |
Authors
Dates
2015-01-20—Published
2013-08-19—Filed