FIELD: fixed construction.
SUBSTANCE: invention relates to the field of environmental protection, in particular, to creation of cutoff curtains in soil masses for the purpose of localising and preventing the migration of polluting substances from buried, underground, and aboveground sites of accumulation and disposal of various classes of waste. The method for creating a trench-type clay curtain involves developing a trench according to the "slurry wall" technology while filling with a bentonite drilling mud based on bentonite powder and process water at the ratio thereof of (5-10):(90-95). The trench is filled with a highly plastic binder composition based on bentonite clays and water, with a density of 1.20 to 1.25 g/cm3, under a pressure of 2.0 to 4.0 atm. through supply branch pipes, replacing and simultaneously pumping the drilling mud by discharge branch pipes.
EFFECT: increase in the durability of the waterproofing screen.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCING A CLAY SOIL PILE | 2020 |
|
RU2767469C1 |
METHOD FOR PRODUCING HORIZONTAL AND OBLIQUE GROUND-CLAY ELEMENT BY MIXING METHOD | 2022 |
|
RU2794444C1 |
METHOD FOR PRODUCING HORIZONTAL AND OBLIQUE GROUND-CLAY ELEMENT BY JETTING | 2022 |
|
RU2804093C1 |
BENTONITE STRUCTURE FORMER FOR CONSTRUCTION, ANNULAR INJECTION AND SHIELD TUNNELING OF TUNNELS | 2023 |
|
RU2810661C1 |
METHOD FOR LIQUIDATING EARTHY PIT-ACCUMULATOR PROVIDED FOR WASTES FROM DRILLING | 1992 |
|
RU2040633C1 |
METHOD FOR CONSTRUCTING SLUDGE STORAGE PIT FOR WELL CUTTINGS AT OIL AND GAS DEPOSITS (VERSIONS) | 2014 |
|
RU2558834C1 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
METHOD FOR CREATION OF A WALL IN THE GROUND | 2022 |
|
RU2789910C1 |
Authors
Dates
2022-05-11—Published
2021-02-05—Filed