FIELD: transport.
SUBSTANCE: proposed method comprises installing the winch of rope replacement with rope to be suspended, and installing lifting vessels nearby extreme receiving platforms. Then, ropes to be installed and replaced are connected by clips and passed in the shaft sump section to be locked on mounting bridge for replaced rope end to be cut. Now, replaced rope end is disconnected from the bottom lifting vessel and carried on the winch for rope replacement, end of the rope to be suspended is connected to the winch, vessels are transferred into opposite extreme position. One rope is mounted and that to be replaced is removed.
EFFECT: ease of rope replacement.
8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPLACEMENT OF ROPES OF MINE WINDING PLANT WITH FRICTION PULLEY, AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2409513C1 |
METHOD OF CABLE TRANSPORTING | 2007 |
|
RU2349534C1 |
METHOD OF REPLACING INHAUL CABLE OF MULTI-CABLE CABLEWAY AND SPECIAL DEVICE TO THIS END | 2010 |
|
RU2449939C2 |
METHOD FOR SUSPENDING AND REPLACING BALANCING ROPES OF MULTI-ROPE HOISTING INSTALLATIONS | 0 |
|
SU1038276A1 |
METHOD OF REPLACING ROPES IN MINE HOISTING INSTALLATION | 0 |
|
SU1034979A1 |
METHOD OF REPLACING ROPES IN MULTIROPE HOISTING INSTALLATIONS | 0 |
|
SU971772A1 |
METHOD OF REPLACING LEADING ROPE OF MINE HOIST | 0 |
|
SU1493580A1 |
METHOD OF REPLACING ROPES IN MULTIPLE-ROPE HOISTS | 0 |
|
SU1451087A1 |
METHOD OF SUCCESSIVE REPLACEMENT OF HEAD ROPE IN LOAD HANDLING ARRANGEMENT | 0 |
|
SU1504195A1 |
METHOD OF REPLACING ROPES IN FRICTION-PULLEY MINE WINDER | 0 |
|
SU1627492A1 |
Authors
Dates
2011-01-20—Published
2009-06-04—Filed