FIELD: construction.
SUBSTANCE: invention relates to the field of construction, namely, to structures of underground facilities under conditions of existing development and in weak and water-saturated soils. Design of underground facility represents a system of joined sections of vertical shells with Gauss curvature. Room basement is made of shell of double curvature. Structure stability as a whole is maintained with a system of ceilings, spacers and membranes.
EFFECT: increased reliability of underground premises structures erected under complicated engineering-geological conditions.
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CONSTRUCT MULTISTOREY UNDERGROUND STRUCTURES UNDER COMPLICATED ENGINEERING-GEOLOGICAL CONDITIONS | 2009 |
|
RU2417285C1 |
METHOD OF CONSTRUCTING TUNNEL UNDER TRAFFIC ARTERIES FOR ORGANISING TRAFFIC INTERSECTIONS AT CROSS-ROADS | 2008 |
|
RU2375522C1 |
PROCESS OF CONSTRUCTION OF TUNNELS IN SOFT WATER-SATURATED GROUND | 1991 |
|
RU2006583C1 |
STAY-IN-PLACE FORM FOR ERECTION OF WALLS IN SOIL | 2011 |
|
RU2482243C1 |
SHALLOW TUNNEL IN SOFT WATER-SATURATED GROUND CONDITIONS | 2012 |
|
RU2504618C1 |
PRESTRESSED SHALLOW FOUNDATION | 2010 |
|
RU2464381C2 |
FRAME OF BUILDING ERECTED NEAR EXISTING BUILDINGS | 2009 |
|
RU2420629C2 |
METHOD TO ERECT RECESSED STRUCTURES AND UNDERGROUND STRUCTURES OF BUILDINGS | 2012 |
|
RU2491387C1 |
HAWSER STRUCTURE | 1994 |
|
RU2068046C1 |
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE | 2009 |
|
RU2414563C1 |
Authors
Dates
2011-01-27—Published
2009-09-02—Filed