FIELD: construction industry. SUBSTANCE: soft water-saturated ground in removed from within the limits of inclined tunnel and replaced with concrete with formation of continuous pillar of necessary thickness along its outer outline. Pillar provides for protection against penetration of floating earth and ground water. Then section beyond formed pillar is filled with material having lesser density. Material with lesser density is used to fill section within which limits tunnel with erection of permanent lining in case of necessity is driven. EFFECT: increased efficiency and reliability of tunnel driving. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF ESCALATOR CASCADE COMPLEX FOR THE ENTRANCE TO THE METRO STATION, CONSTRUCTED USING CUT-AND-COVER METHOD | 2021 |
|
RU2766876C1 |
METHOD FOR CONSTRUCTION OF ESCALATOR TUNNEL CONSTRUCTED BY TUNNELLING IN WEAK WATERLOGGED SOILS | 2021 |
|
RU2768765C1 |
METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS | 1995 |
|
RU2111361C1 |
METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS | 2020 |
|
RU2739880C1 |
METHOD OF ERECTING DEEP UNDERGROUNG STATION | 0 |
|
SU1763584A1 |
METHOD FOR ERECTING DEEP SUBWAY STATION | 1993 |
|
RU2061148C1 |
DOUBLE-LEVEL SINGLE-VAULT TRANSFER STATION UNIT OF DEEP SUBWAY | 1996 |
|
RU2131960C1 |
METHOD OF CONSTRUCTING TUNNEL UNDER TRAFFIC ARTERIES FOR ORGANISING TRAFFIC INTERSECTIONS AT CROSS-ROADS | 2008 |
|
RU2375522C1 |
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK | 2022 |
|
RU2785300C1 |
POWERED SHIELD COMPLEX FOR CONSTRUCTION OF TUNNELS WITH PREFABRICATED EMBEDDED IN ROCK LINING | 1988 |
|
RU2018677C1 |
Authors
Dates
1994-01-30—Published
1991-06-27—Filed