Abstract RU 2417285 C1

FIELD: construction.

SUBSTANCE: method to construct multistorey underground structures in weak water-saturated soils in districts of existing development, including arrangement of vertical walls, arrangement of floor ceilings and subsequent removal of soil from the foundation pit, differing by the fact that position of vertical walls is reliably fixed in their lower part with a concrete diaphragm laid at the bottom of the foundation pit without extraction of soil; in the upper part the vertical walls are fixed with spreader beams laid onto soil foundation at the elevation of upper ceiling of the structure along the external contour of the foundation pit, and a frame installed along the external contour of the foundation pit onto soil foundation also at the elevation of the upper ceiling; spreader beams, in their turn, are supported with a system of horizontal longitudinal and transverse beams, which are mounted at the level of the ceiling, afterwards the soil mass is removed from the foundation pit to the elevation of the ceiling of the lower floor; at the level of the lower floor the similar technological operations are carried out to arrange spreader beams and a system of longitudinal and transverse beams that support spreader beams; afterwards the soil mass is removed to the level of the ceiling of the next floor below, and all technological operations are repeated; finally the soil mass is removed from the foundation pit to the diaphragm that closes the foundation pit bottom, afterwards the diaphragm surface is levelled, and ceilings are assembled, in the "bottom-up" order.

EFFECT: invention provides for higher reliability of all elements of a structure and a facility as a whole.

2 dwg

Similar patents RU2417285C1

Title Year Author Number
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE 2009
  • Karpov Andrej Viktorovich
RU2414563C1
UNDERGROUND STRUCTURES ARRANGED UNDER COMPLICATED ENGINEERING-GEOLOGICAL CONDITIONS 2009
  • Mangushev Rashid Abdulovich
  • Oshurkov Nikolaj Vasil'Evich
  • Gutovskij Valerij Ehduardovich
RU2410494C1
METHOD OF CONSTRUCTING TUNNEL UNDER TRAFFIC ARTERIES FOR ORGANISING TRAFFIC INTERSECTIONS AT CROSS-ROADS 2008
  • Mangushev Rashid Abdullovich
  • Gorodnova Elena Vladimirovna
  • Osokin Anatolij Ivanovich
RU2375522C1
SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (DEVICE AND METHOD NAMED AFTER YURKEVICH PB) 2012
  • Jurkevich Pavel Borisovich
RU2505646C2
METHOD FOR STRUCTURE CONSTRUCTION IN THE UNDER-RUNNER SPACE OF RIVERS AND CANALS IN URBAN DEVELOPMENT 2021
  • Dzhantimirov Khristofor Avdeevich
  • Zvezdov Andrei Ivanovich
  • Kitaikin Viacheslav Anatolevich
  • Chernov Ruslan Igorevich
RU2770187C1
PROCESS OF ERECTION OF MULTILEVEL UNDERGROUND STRUCTURE ( VARIANTS ) 2003
  • Zege S.O.
  • Zege I.A.
  • Zege N.S.
RU2220258C1
METHOD FOR BUILDING OF MULTISTORY UNDERGROUND STRUCTURE WITH SIMULTANEOUS EXCAVATION OF BASIN 1999
  • Gusarov A.V.
  • Gusarov V.A.
  • Kadzhaja T.G.
  • Seljametov I.M.
  • Koldin V.N.
RU2136818C1
MULTI-PURPOSE BUILDING 2007
  • Davydov Vladimir Nikolaevich
  • Egorov Dmitrij Gennadievich
  • Selivanov Sergej Nikolaevich
  • Sharipov Marsel' Ingelovich
  • Shubin Ruslan Valer'Evich
RU2345200C2
SINGLE-VAULT MULTILEVEL SUBWAY STATION AND METHOD OF ITS CONSTRUCTION (P.B. YURKEVICH'S DESIGN) 2014
  • Jurkevich Pavel Borisovich
RU2562359C2
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION 2018
  • Dzhantimirov Khristofor Avdeevich
  • Ibragimov Medikhat Nasibulovich
RU2692396C1

RU 2 417 285 C1

Authors

Mangushev Rashid Abdulovich

Oshurkov Nikolaj Vasil'Evich

Gutovskij Valerij Ehduardovich

Dates

2011-04-27Published

2009-12-23Filed