PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) Russian patent published in 2011 - IPC E21B43/26 

Abstract RU 2412347 C1

FIELD: oil and gas production.

SUBSTANCE: procedure consists in following stages: in lowering disconnecting column into borehole, also, drill column contains one or several couplings, one or several couplings wrapped with filter and multitude of swelling packers arranged around shank end at specified distance; and in swelling at least one of swelling packers to disconnect zones of one or several chosen intervals. Also, one or several couplings wrapped with filter and one or several couplings are arranged around the shank end at specified distance from each other for placement at least one or several couplings wrapped with filter and at least one or several couplings in one or several chosen intervals. Inside the shank end there is installed a shifter. The shifter controls positioning one or several couplings and one or several couplings wrapped with filter. The actuated shifter drives one or several couplings into an open position to intensify inflow from at least one or several chosen intervals, when fluid medium is supplied via one or several orifices of the shank end and to one or several orifices in one or several couplings. Additionally, the shifter is actuated to drive one or several couplings into a closed position to a repeated disconnection of zones of at least one or several chosen intervals. Further, the shifter is actuated to drive one or several couplings wrapped with filter in an open position to facilitate flow of produced fluid from at least one or several chosen intervals via at least one or several orifices in the shank end and via multitude orifices in at least one or several couplings wrapped with filter.

EFFECT: raised efficiency of procedure.

11 cl, 29 dwg

Similar patents RU2412347C1

Title Year Author Number
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
METHOD FOR COMPLETION OF CONSTRUCTION OF PRODUCTION WELL WITH HORIZONTAL END OF WELLBORE 2019
  • Sannikov Yurij Aleksandrovich
  • Klevtsur Anatolij Petrovich
  • Gorbunov Aleksandr Gennadevich
  • Oblasova Lyudmila Anatolevna
  • Zevakov Mikhail Evgenevich
  • Tukmakova Tatyana Nuriakhmetovna
RU2726096C1
METHOD AND SYSTEM FOR HYDRAULIC FRACTURING 2010
  • Richard Bennett M.
  • Syuj Yan
RU2671373C2
BYPASS ARRANGEMENT OF GRAVEL FILTER 2013
  • Van Petegem Ronald
  • Braussard Dzhon P.
  • Kholl Kristofer
  • Tsimmerman Patrik Dzh.
RU2588508C2
LINER CEMENTING ASSEMBLY AND NOSE-TO-TOE INSTALLATION OF GRAVEL FILTER PER ONE RUN 2013
  • Braussard Dzhon P.
  • Kholl Kristofer
  • Van Petegem Ronald
  • Arrazola Alvaro Dzh.
RU2578064C2
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION 2008
  • Surdzhaatmadzha Dzhim B.
  • Khauehll Mehtt'Ju T.
RU2431036C2
DOWNHOLE TESTING METHOD IN OPEN HOLE 2016
  • Isaev Yurij Nikolaevich
  • Korostelev Aleksej Sergeevich
  • Sukhachev Yurij Vladimirovich
RU2625126C1
METHODS AND ASSEMBLY FOR ISOLATION OF ZONES IN WELL BOREHOLE 2012
  • Braussard Dzhon
  • Natli Brajan
  • Klark Ross
  • Natli Kim
RU2535320C2

RU 2 412 347 C1

Authors

Ist Lojd Eh. Ml.

Dates

2011-02-20Published

2008-04-02Filed